BLD07-02248
| FIRE-Final Inspection | 12/16/2008 | 12/16/2008 | 12/16/2008 4:46:44 PM | P | PASS |
|
|
Shell fire life safety pass completed 8/20
|
FIR08-00752
| INSP-Final Inspection | 12/16/2008 | 12/16/2008 | 12/16/2008 4:42:16 PM | P | FAIL |
|
|
Noted mixed response and temperature heads within the same fire area at the NE portion of tenant remodel.
|
BLD08-01904
| FIRE-Final Inspection | 12/16/2008 | 12/16/2008 | 12/16/2008 4:39:44 PM | P | PASS |
|
|
Fire life safety passed.
|
FIR08-00685
| INSP-Final Inspection | 12/16/2008 | 12/16/2008 | 12/16/2008 4:39:24 PM | P | PASS |
|
|
Fire sprinkler permit finaled.
|
FIR08-00544
| INSP-Sprinkler Rough-in/Hydro | 12/16/2008 | 12/16/2008 | 12/16/2008 4:38:47 PM | P | FAIL |
|
|
Two heads at a meeting room need relocated, one head at a storage room is overspaced, annotated areas on plans approved for cover with today's date.
|
FIR08-00018
| INSP-Sprinkler Rough-in/Hydro | 12/15/2008 | 12/16/2008 | 12/16/2008 4:37:00 PM | A | PART |
|
|
9th floor C/N items field verified
|
BLD08-02101
| FIRE-Conference | 12/15/2008 | 12/16/2008 | 12/16/2008 11:45:25 AM | A | DONE |
|
|
On site inspection regarding portions of permit work completed to date including fire sprinkler system modifications.
|
FIR07-01051
| INSP-Sprinkler Rough-in | 12/15/2008 | 12/16/2008 | 12/16/2008 11:43:18 AM | A | PART |
|
|
Seismic attatchments at hangers for overhead piping at the mechanical mezzanine between gyms, the wrestling room/platform, and the south entry vestibule okayed. Also inspected piping to sidewall heads at three 2nd floor media area skylights -approved for cover.
|
BLD08-00941
| FIRE-Final Inspection | 12/15/2008 | 12/16/2008 | 12/16/2008 10:55:33 AM | A | FAIL |
|
|
Need to test the new door mag lock for drop out on fire alarm condition, four exit signs are not functional on backup power source, inspection concluded at this time-to be rescheduled.
|
BLD08-02125
| FIRE-Final Inspection | 12/15/2008 | 12/16/2008 | 12/16/2008 10:53:16 AM | A | PASS |
|
|
Correction notice items verified for completion, life safety finaled.
|