FIR08-00500
| INSP-Sprinkler Rough-in/Hydro | 12/15/2008 | 12/16/2008 | 12/16/2008 5:36:01 PM | P | PASS |
|
|
The remaining hydro tests passed.
|
FIR08-00647
| INSP-Final Inspection | 12/12/2008 | 12/16/2008 | 12/16/2008 3:13:54 PM | P | PART |
|
|
The underground supply flush passed.
|
BLD08-00424
| FIRE-Final Inspection | 12/16/2008 | 12/16/2008 | 12/16/2008 3:12:36 PM | P | PASS |
|
|
Life safety passed.
|
FIR08-00341
| INSP-Alarm Testing | 12/15/2008 | 12/16/2008 | 12/16/2008 3:12:11 PM | A | DONE |
|
|
See the city approved plans for devices tested. The audio/visuals were also tested. The interconnections between the NAC panels tested ok. The existing NAC panel in the mechanical room needs 12.7 ah batteries. Supervision failed on the 110ah battery backup.
|
BLD07-01845
| FIRE-Final Inspection | 12/15/2008 | 12/16/2008 | 12/16/2008 11:38:23 AM | A | PART |
|
|
The dining area is ok to occupy.
|