Inspections for the day of: Friday, December 16, 2011.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC11-00761 BMP Violation12/16/201112/16/201112/16/2011 4:47:33 PMPPART
Backfilling operations are in process of being completed, hard surfaces being swept at end of work day.
ESC11-00760 BMP Violation12/16/201112/16/201112/16/2011 4:47:20 PMPPART
Backfilling operations are in process of being completed, hard surfaces being swept at end of work day.
ESC11-00758 BMP Violation12/16/201112/16/201112/16/2011 4:47:08 PMPPART
Backfilling operations are in process of being completed, hard surfaces being swept at end of work day.
ESC11-00757 BMP Violation12/16/201112/16/201112/16/2011 4:45:58 PMPPART
Backfilling operations are in process of being completed, hard surfaces being swept at end of work day.
ESC11-00422 Random Inspection12/16/201112/16/201112/16/2011 2:32:42 PMPPASS
ESC11-00423 Random Inspection12/16/201112/16/201112/16/2011 2:32:31 PMPPASS
ESC11-00425 Random Inspection12/16/201112/16/201112/16/2011 2:32:19 PMPPASS
ESC11-00420 Random Inspection12/16/201112/16/201112/16/2011 2:32:07 PMPPASS
ESC11-00031 Random Inspection12/16/201112/16/201112/16/2011 2:31:53 PMPPASS
ESC11-00029 Random Inspection12/16/201112/16/201112/16/2011 2:25:35 PMPPASS
GCB11-00041 GCB-Final12/16/201112/16/201112/16/2011 1:35:21 PMPFAIL
Chad @ ###-####call for access - PM Inspection. Provide approved plans, add wires to diffusers in ceiling grid. Cannot get into stairwell to inspect mezz. or handrails. All door hardware not yet installed, grab bars and mirrors in restrooms not yet installed.
ESC08-00407 General Inspection12/16/201112/16/201112/16/2011 11:08:08 AMAPART
Needs to sweep all silts from hard surfaces, clean all drain inlets and establish a construction enterance and provide top dressing at enterance/exit. Also Provide updated info on ESC permit sign and post at proper location. Verbal correction notice was issued.
BLD08-00986 BLD-Other12/15/201112/16/201112/16/2011 11:04:07 AMAFAIL
morgan - shear inspection - please call 1/2 hr prior so he can meet you there Phone #: ###-####. Needs to provide staple conversion chart from engineer, Roof diapdragm also stapled, needs to be nailed. Also needs to install all blocking and straps as noted on approved plans.