BLD13-03207
| BLD-Footing | 12/13/2013 | 12/16/2013 | 12/16/2013 6:06:33 PM | P | PASS |
|
|
Ryan Phone #: ###-####
|
BLD13-03206
| BLD-Footing | 12/13/2013 | 12/16/2013 | 12/16/2013 6:00:55 PM | P | CANC |
|
|
Ryan Phone #: ###-####
|
BLD13-02842
| BLD-Framing/Rough-in | 12/13/2013 | 12/16/2013 | 12/16/2013 4:47:22 PM | P | PASS |
|
|
Gabe Phone #: ###-####
|
BLD13-02794
| BLD-Framing/Rough-in | 12/13/2013 | 12/16/2013 | 12/16/2013 3:11:55 PM | A | PASS |
|
|
Micah Phone #: ###-####
|
BLD13-01248
| BLD-Energy code compliance | 12/13/2013 | 12/16/2013 | 12/16/2013 2:43:26 PM | A | PASS |
|
|
Travis Phone #: ###-####
|
BLD13-01449
| BLD-Footing | 12/13/2013 | 12/16/2013 | 12/16/2013 2:40:55 PM | P | PART |
|
|
Jesse Phone #: ###-#### Approx 2/3's of footings at East structure....... Following cold weather provisions. Rick Cummings (P/W) and Resident Struct Engineer observing concrete proceedures. MTI special inspections.
|
ESC13-00423
| Site Final | 12/16/2013 | 12/16/2013 | 12/16/2013 12:59:54 PM | P | NR |
|
|
Ground frozen....Need to stabilize.
|
MIS13-00330
| BLD-Conference | 12/16/2013 | 12/16/2013 | 12/16/2013 12:22:47 PM | P | DONE |
|
|
Complaint Issued Stop work order. Installing new flooring, painting, new ceiling grid, New low volt wiring. Didn't notice if any walls or electr wiring done. Large dumpster is full.
|
BLD13-01127
| BLD-Final | 12/11/2013 | 12/16/2013 | 12/16/2013 11:32:57 AM | A | PASS |
|
|
Jen Phone #: ###-####
|
BLD13-01127
| DOC - Permit Finaled | 12/16/2013 | 12/16/2013 | 12/16/2013 11:32:45 AM | P | PASS |
|
|
|