BLD13-03371
| FIRE-Final Inspection | 12/16/2013 | 12/16/2013 | 12/16/2013 3:36:15 PM | P | FAIL |
|
|
Provide revised floor plan showing the new wall and door. Provide corrected hardware on the said door.
|
BLD13-00979
| FIRE-Final Inspection | 12/16/2013 | 12/16/2013 | 12/16/2013 3:33:08 PM | P | FAIL |
|
|
Provide no parking signage as per the approved plans
|
FIR13-00655
| INSP-Final Inspection | 12/10/2013 | 12/16/2013 | 12/16/2013 2:41:37 PM | A | FAIL |
|
|
Provide as-builts and map for the FACP. Need all of the final documents signed
|
FIR13-00576
| INSP-Final Inspection | 12/13/2013 | 12/16/2013 | 12/16/2013 2:38:13 PM | A | PASS |
|
|
Permit finaled
|
BLD13-02393
| FIRE-Final Inspection | 12/16/2013 | 12/16/2013 | 12/16/2013 10:40:41 AM | P | PASS |
|
|
life safety passed
|
FIR13-00666
| INSP-Sprinkler Rough-in | 12/12/2013 | 12/16/2013 | 12/16/2013 9:39:43 AM | A | PASS |
|
|
See the city approved plans for locations where sprinkler piping is ok to cover marked "ok"
|