Inspections for the day of: Tuesday, December 16, 2014.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorEvan Jenkins
TitleEROSION CONTROL MANAGER
Phone #794-3958
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC14-00970 Site Preparation12/16/201412/16/201412/16/2014 3:33:05 PMPPASS
Adam Phone #: ###-####
Permit Posted w/ No ESC Issues. Lot is really flat and chances of offsite discharge is slim.
Approved
ESC14-01033 Tracking Control12/16/201412/16/201412/16/2014 2:56:04 PMPFAIL
Significant Trackout from site onto 5 Mile Road. Called RP Lance and left VM describing Violations and for him to contact me back.
Corrections:
1.) Install Construction Entrance/Exit
2.) Sweep 5 Mile Road and Entry
3.) Install Drop Inlet Protection
4.) Post Permit onsite in visible area
Schedualed a BMP Violation inspection for tomorrow afternoon 12-17-14 to follow up to see if any effort has been performed to address violations
ESC14-00654 General Inspection12/16/201412/16/201412/16/2014 2:27:45 PM PASS
ESC13-01239 Aging Inspection12/16/201412/16/201412/16/2014 12:35:41 PM PASS
ESC14-00580 Aging Inspection12/16/201412/16/201412/16/2014 12:20:34 PM PASS
see final
ESC14-00580 DOC - Permit Finaled12/16/201412/16/201412/16/2014 12:20:23 PMPPASS
complete
no esc issues
ESC14-00487 General Inspection12/16/201412/16/201412/16/2014 8:54:23 AM PASS
Currently only interior work occuring at time of inspection. No ESC Issues at this time
ESC14-00477 Aging Inspection12/16/201412/16/201412/16/2014 8:42:22 AM PASS
WIP: 3 SFH's currently being constructed. No ESC issues at this time
ESC14-00203 Aging Inspection12/16/201412/16/201412/16/2014 8:25:46 AM PASS