MIS01-00160
| MIS-Aging Inspection | 12/17/2001 | 12/17/2001 | 12/17/2001 12:00:00 AM | | PART |
|
|
|
MEC01-03246
| Final | 12/10/2001 | 12/17/2001 | 12/17/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/10/2001 at 13:10:48. Contact: ###-####.. Need to insulate all exposed metal duct c/n posted at unit. 12/17/2001 10:42:51 AM
|
BLD01-01386
| BLD-Final | 12/12/2001 | 12/17/2001 | 12/17/2001 12:00:00 AM | A | NR |
|
|
###-####. called contractor no guardrail or hand rail at ext deck also no mechanical final. did not go in house as this is not ready. 12/17/2001 11:11:42 AM
|
BLD01-01285
| BLD-Final | 12/14/2001 | 12/17/2001 | 12/17/2001 12:00:00 AM | A | FAIL |
|
|
###-####. 12/17/2001 11:34:20 AM. insulate exposed rim board in crawl only, handrails not required at the 3 step areas. 12/17/2001 1:56:13 PM
|
MEC01-03771
| Final | 12/14/2001 | 12/17/2001 | 12/17/2001 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 12/14/2001 at 11:37:33. Contact: ###-####.rough-in only face not yet done will be brick. 12/17/2001 11:34:48 AM
|
BLD01-03165
| BLD-Footing | 12/14/2001 | 12/17/2001 | 12/17/2001 12:00:00 AM | A | NR |
|
|
DAN ###-####. nothing done yet. except excavation. 12/17/2001 10:53:08 AM
|
BLD01-02808
| BLD-Framing/Rough-in | 12/13/2001 | 12/17/2001 | 12/17/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/13/2001 at 14:12:19. Contact: ###-####.c/n posted. 12/17/2001 4:11:54 PM
|
MEC01-03767
| Final | 12/17/2001 | 12/17/2001 | 12/17/2001 12:00:00 AM | P | PASS |
|
|
after 12:30 ###-####
|
BLD01-02678
| BLD-Framing/Rough-in | 12/17/2001 | 12/17/2001 | 12/17/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/17/2001 at 10:10:48. Contact: ###-####.
|
BLD00-03194
| BLD-Conference | 12/17/2001 | 12/17/2001 | 12/17/2001 12:00:00 AM | P | PART |
|
|
Added by Inspector: 407 On 12/17/2001 2:10:24 PM need detail for 4 hour fire wall, ul u901, need to fully grout cells,first pour has been done and has not been fully grouted, called architect will need to provide details for 4 hour compliance,also contractor on site notified.
|