Inspections for the day of: Monday, December 17, 2001.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MIS01-00160 MIS-Aging Inspection12/17/200112/17/200112/17/2001 12:00:00 AM PART
MEC01-03246 Final12/10/200112/17/200112/17/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 12/10/2001 at 13:10:48. Contact: ###-####.. Need to insulate all exposed metal duct c/n posted at unit. 12/17/2001 10:42:51 AM
BLD01-01386 BLD-Final12/12/200112/17/200112/17/2001 12:00:00 AMANR
###-####. called contractor no guardrail or hand rail at ext deck also no mechanical final. did not go in house as this is not ready. 12/17/2001 11:11:42 AM
BLD01-01285 BLD-Final12/14/200112/17/200112/17/2001 12:00:00 AMAFAIL
###-####. 12/17/2001 11:34:20 AM. insulate exposed rim board in crawl only, handrails not required at the 3 step areas. 12/17/2001 1:56:13 PM
MEC01-03771 Final12/14/200112/17/200112/17/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 12/14/2001 at 11:37:33. Contact: ###-####.rough-in only face not yet done will be brick. 12/17/2001 11:34:48 AM
BLD01-03165 BLD-Footing12/14/200112/17/200112/17/2001 12:00:00 AMANR
DAN ###-####. nothing done yet. except excavation. 12/17/2001 10:53:08 AM
BLD01-02808 BLD-Framing/Rough-in12/13/200112/17/200112/17/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 12/13/2001 at 14:12:19. Contact: ###-####.c/n posted. 12/17/2001 4:11:54 PM
MEC01-03767 Final12/17/200112/17/200112/17/2001 12:00:00 AMPPASS
after 12:30 ###-####
BLD01-02678 BLD-Framing/Rough-in12/17/200112/17/200112/17/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 12/17/2001 at 10:10:48. Contact: ###-####.
BLD00-03194 BLD-Conference12/17/200112/17/200112/17/2001 12:00:00 AMPPART
Added by Inspector: 407 On 12/17/2001 2:10:24 PM need detail for 4 hour fire wall, ul u901, need to fully grout cells,first pour has been done and has not been fully grouted, called architect will need to provide details for 4 hour compliance,also contractor on site notified.