Inspections for the day of: Tuesday, December 17, 2002.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-00230 BLD-Aging Inspection12/17/200212/17/200212/17/2002 12:00:00 AM DONE
BLD02-02753 BLD-Framing/Rough-in12/16/200212/17/200212/17/2002 12:00:00 AMAPART
JEFF; Phone #: ###-#### Internet Inspection Request from: Darla Downs
east int walls ok 12/17/2002 11:44:02 AM
BLD02-00268 BLD-Conference12/16/200212/17/200212/17/2002 12:00:00 AMAPART
DAVE ###-#### NEED INSPECTION TO EXTEND PERMIT
ok for 180 days 12/17/2002 11:47:40 AM
BLD02-02677 BLD-Framing/Rough-in12/16/200212/17/200212/17/2002 12:00:00 AMAFAIL
###-#### c/n posted 12/17/2002 11:44:26 AM
MEC02-03183 Final12/16/200212/17/200212/17/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 12/16/2002 at 14:32:02. Contact: ###-####.
BLD01-03251 BLD-Energy code compliance12/16/200212/17/200212/17/2002 12:00:00 AMAPART
Will also be scheduling Framing/Rough-in if you want to do both at the same time.; Phone #: ###-#### Internet Inspection Request from: Richard Fritzley
need to seal more 12/17/2002 10:26:09 PM 12/17/2002 10:26:52 PM
BLD01-03251 BLD-Wall cover12/16/200212/17/200212/17/2002 12:00:00 AMPFAIL
HVAC subcontractor (Glynn's Heating & AC) is supposed to schedule their inspection for the morning, so this should be ready for you in the afternoon. I also scheduled the Energy code inspection for the morning, but you may want to do them both at the same time. Please call so I can get to the job site. It takes about 15 minutes to get there from my work. Thanks.; Phone #: ###-#### Internet Inspection Request from: Richard Fritzley
c/n posted, ok to insulate 12/17/2002 10:28:28 PM
BLD02-02395 BLD-Final12/2/200212/17/200212/17/2002 12:00:00 AMPCANC
415 to check on status of temp. occ.
BLD02-01951 BLD-Final12/17/200212/17/200212/17/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 12/17/2002 at 08:23:58. Contact: ###-####.c/n posted 12/17/2002 10:27:22 PM
MEC02-03710 Rough-in12/17/200212/17/200212/17/2002 12:00:00 AMPPASS
###-####
MEC02-03710 Pressure Test12/17/200212/17/200212/17/2002 12:00:00 AMPPASS
BLD02-02626 BLD-Framing/Rough-in12/17/200212/17/200212/17/2002 12:00:00 AMPCANC
Scheduled by a contractor via Hello! on 12/17/2002 at 08:43:10. Contact: ###-####.
did not see this was on list due to comp. not working after 12:45 12/17/2002 10:36:19 PM
MEC02-03558 Rough-in12/17/200212/17/200212/17/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 12/17/2002 at 09:34:46. Contact: ###-####.c/n posted 12/17/2002 10:27:53 PM
BLD02-02493 BLD-Framing/Rough-in12/17/200212/17/200212/17/2002 12:00:00 AMPCANC
###-#### richard
did not see this was on list due to comp. not working past 12:45 12/17/2002 10:37:36 PM
BLD02-02299 BLD-Final12/17/200212/17/200212/17/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 12/17/2002 at 10:36:22. Contact: ###-####.
c/n posted 12/17/2002 10:28:56 PM
BLD02-01421 BLD-Final12/17/200212/17/200212/17/2002 12:00:00 AMPNH
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung