FIR03-00453
| FIR-Aging Inspection | 12/17/2003 | 12/17/2003 | 12/17/2003 12:00:00 AM | | NR |
|
|
According to phil the work is in progress 12/17/2003 2:08:37 PM
|
FIR03-00735
| INSP-Final Inspection | 12/15/2003 | 12/17/2003 | 12/17/2003 12:00:00 AM | A | PASS |
|
|
hood suppression system operated correctly and I spoke with the regional Ansul representative and he stated that the system can be installed in the shelf hood as long as the noozles are correct. Checked nozzles and they needed changed. Permit Finaled 12/17/2003 9:33:14 AM
|
BLD03-01116
| FIRE-Conference | 12/16/2003 | 12/17/2003 | 12/17/2003 12:00:00 AM | A | DONE |
|
|
jenny ###-#### Had conference with Jenny and went over remaining items before I can sign a permanent occupancy 12/17/2003 1:59:52 PM
|
BLD02-02896
| FIRE-Final Inspection | 12/16/2003 | 12/17/2003 | 12/17/2003 12:00:00 AM | A | FAIL |
|
|
Need to provide approved hardware on the restroom door. 12/17/2003 2:05:38 PM
|
BLD03-01983
| FIRE-Final Inspection | 12/16/2003 | 12/17/2003 | 12/17/2003 12:00:00 AM | A | FAIL |
|
|
Inspection turned into a conference on the life safety notes. The contractor was not ready for an inspection. 12/17/2003 10:31:29 AM
|
FIR01-00124
| INSP-Supply line flush | 12/17/2003 | 12/17/2003 | 12/17/2003 12:00:00 AM | P | PASS |
|
|
Underground hydro test is ok 12/18/2003 8:36:37 AM
|