FIR08-00628
| INSP-Sprinkler Rough-in | 12/17/2008 | 12/17/2008 | 12/17/2008 4:37:35 PM | P | PASS |
|
|
See the city approved plans for the location on the second floor where the sprinkler piping is ok to cover.
|
FIR08-00341
| INSP-Alarm Testing | 12/16/2008 | 12/17/2008 | 12/17/2008 4:26:50 PM | A | DONE |
|
|
Additional initiating devices were tested today. See the city approved plans for devices. The fire alarm plans need to be resubmitted showing the door magnets. Also the fire alarm panel is having undefined troubles showing up and the graphic annunciator is not operating. No more testing will be done until the fire alarm system is completely functional.
|
FIR08-00584
| INSP-Final Inspection | 12/16/2008 | 12/17/2008 | 12/17/2008 3:08:37 PM | A | FAIL |
|
|
Provide map at the facp, provide smoke detector over the panel and provide as-builts.
|
FIR08-00647
| INSP-Final Inspection | 12/16/2008 | 12/17/2008 | 12/17/2008 3:07:58 PM | A | PASS |
|
|
Permit finaled
|
BLD08-02156
| FIRE-Final Inspection | 12/16/2008 | 12/17/2008 | 12/17/2008 9:20:44 AM | A | PASS |
|
|
Life safety passed
|