FIR10-00610
| INSP-Sprinkler Rough-in | 12/16/2010 | 12/17/2010 | 12/17/2010 2:50:04 PM | P | PASS |
|
|
Permit finaled
|
FIR10-00015
| INSP-Final Inspection | 12/16/2010 | 12/17/2010 | 12/17/2010 2:27:34 PM | A | PASS |
|
|
Permit finaled
|
FIR10-00432
| INSP-Final Inspection | 12/16/2010 | 12/17/2010 | 12/17/2010 1:14:47 PM | A | FAIL |
|
|
Re-label zone #1 since it now includes the basement zone. This arrangement has been approved by the plan reviewer. Also provide as-builts as discussed.
|
BLD10-02686
| FIRE-Final Inspection | 12/17/2010 | 12/17/2010 | 12/17/2010 12:14:05 PM | P | FAIL |
|
|
Life safety is ok to pass when the fire permit for the AES panel has been addressed/approved. The related fire permit number is FIR09-00107.
|
FIR10-00636
| INSP-Final Inspection | 12/16/2010 | 12/17/2010 | 12/17/2010 11:04:48 AM | A | PASS |
|
|
Permit finaled
|