Inspections for the day of: Monday, December 17, 2012.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD12-01461 FIRE-Final Inspection12/17/201212/17/201212/18/2012 2:49:48 PMPPART
A temporary occupancy is being given with Scott Arellano's permission until the project related fire alarm and fire sprinkler permits are finaled and the life safety has been passed in all other areas outside of the kitchen. This approval is only for the kitchen area.
FIR12-00640 INSP-Final Inspection12/17/201212/17/201212/18/2012 2:47:19 PMPPART
A temporary occupancy is being given with Scott Arellano's permission until the Arcade/music reduction/shutdown has been installed and tested. This approval is only for the kitchen area.
FIR12-00483 INSP-Final Inspection12/17/201212/17/201212/18/2012 2:45:04 PMPPART
A temporary occupancy is being given with Scott Arellano's permission until all of the ceiling tile has been installed.
FIR12-00609 INSP-Final Inspection12/14/201212/17/201212/18/2012 2:43:57 PMAPASS
Permit finaled. Hood suppression system functioned correctly. Alex to provide correct signage at the manual pull stations.
FIR12-00614 INSP-Sprinkler Rough-in/Hydro12/17/201212/17/201212/17/2012 2:51:59 PMPPASS
The overhead hydro tests of both systems passed. Insulation has been re-attached to the roof deck. Piping is ok to cover.
BLD12-03169 FIRE-Final Inspection12/14/201212/17/201212/17/2012 2:51:04 PMPFAIL
Provide door hardware as marked on the city approved plans, provide one 2A,10BC fire extinguisher w/tag as discussed and provide permit for the required fire sprinkler modifications.
FIR11-00560 INSP-Conference12/14/201212/17/201212/17/2012 2:49:25 PMADONE
Project has been scheduled for a final
FIR11-00085 FIR-Aging Inspection12/17/201212/17/201212/17/2012 2:17:53 PM PASS
Permit has been finaled.
FIR11-00085 INSP-Final Inspection12/17/201212/17/201212/17/2012 2:16:33 PMPPASS
Permit finaled
FIR12-00676 INSP-Sprinkler Rough-in12/14/201212/17/201212/17/2012 1:14:06 PMAPASS
Rough-in passed. Piping is ok to cover. Will verify at the final that the joist spaces have been filled with insulation.