FIR14-00398
| INSP-Sprinkler Rough-in/Hydro | 12/17/2014 | 12/17/2014 | 12/18/2014 11:27:10 AM | P | PASS |
|
|
overhead hydro test passed
|
FIR14-00397
| INSP-Sprinkler Rough-in/Hydro | 12/17/2014 | 12/17/2014 | 12/18/2014 11:26:46 AM | P | PASS |
|
|
Overhead hydro passed
|
BLD14-01863
| FIRE-Final Inspection | 12/17/2014 | 12/17/2014 | 12/18/2014 10:08:15 AM | P | FAIL |
|
|
Started life safety inspection. Missing all of the small documents. I noted problems with exit discharge lighting and access controled egress locks. This was only a partial inspection.
|
FIR14-00812
| INSP-Final Inspection | 12/16/2014 | 12/17/2014 | 12/18/2014 10:07:00 AM | P | FAIL |
|
|
No approved plans on site. Strobes are overspaced into shower stalls and may not provide adequate coverage due to wall obstructions. Also the existing floor areas have smoke detector coverage which may need to be extended into the remodeled area.
|
FIR14-00474
| INSP-Final Inspection | 12/17/2014 | 12/17/2014 | 12/17/2014 3:18:02 PM | P | PART |
|
|
Forward flush passed. No other testing performed due to fire alarm communication problems.
|
FIR14-00480
| INSP-Final Inspection | 12/16/2014 | 12/17/2014 | 12/17/2014 3:14:56 PM | P | CANC |
|
|
Communication was down so no inspection was performed. Jonothan Phone #: ###-####
|
FIR14-00578
| INSP-Sprinkler Rough-in/Hydro | 12/17/2014 | 12/17/2014 | 12/17/2014 1:51:24 PM | P | PASS |
|
|
Rough-in passed. Tenting failed. No time to perform a hydro test
|
FIR14-00574
| INSP-Sprinkler Rough-in/Hydro | 12/16/2014 | 12/17/2014 | 12/17/2014 1:50:15 PM | A | FAIL |
|
|
Hydro tests failed due to visible loss of pressure at the guages.
|
BLD14-01641
| FIRE-Final Inspection | 12/16/2014 | 12/17/2014 | 12/17/2014 10:34:09 AM | A | FAIL |
|
|
Provide fire dept access signage at entrance as discussed, provide additional fire extinguisher in basement, remove deadbolt from interior door, provide remote annunciator/testing of the duct smoke detector.
|
FIR14-00779
| INSP-Sprinkler Rough-in | 12/16/2014 | 12/17/2014 | 12/17/2014 10:30:58 AM | A | PASS |
|
|
Rough-in passed. Piping is ok to cover.
|
BLD14-02814
| FIRE-Final Inspection | 12/16/2014 | 12/17/2014 | 12/17/2014 10:30:03 AM | A | PASS |
|
|
life safety passed
|
FIR14-00847
| INSP-Final Inspection | 12/17/2014 | 12/17/2014 | 12/17/2014 10:29:39 AM | A | PASS |
|
|
permit finaled
|
FIR14-00720
| INSP-Final Inspection | 12/16/2014 | 12/17/2014 | 12/17/2014 10:29:06 AM | A | PASS |
|
|
Permit finaled
|
BLD14-02813
| FIRE-Final Inspection | 12/16/2014 | 12/17/2014 | 12/17/2014 10:28:30 AM | A | PASS |
|
|
life safety passed
|