ELE00-03680
| Final | 12/15/2000 | 12/18/2000 | 12/18/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 12/15/2000 at 07:49:12. Contact: ###-####. temporary occupancy. 12/18/2000 5:05:57 PM
|
ELE00-04287
| Electrical Rough-In | 12/15/2000 | 12/18/2000 | 12/18/2000 12:00:00 AM | P | PASS |
|
|
charlie pager ###-#### r/i . upstairs; 1-bedroom and bathrm. 12/18/2000 5:05:27 PM
|
ELE00-04020
| Electrical Rough-In | 12/18/2000 | 12/18/2000 | 12/18/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 2/18/2000 at 09:19:15. Contact: ###-####.
perm/svc; meter main. 12/18/2000 5:00:56 PM
|
ELE00-04380
| Final | 12/18/2000 | 12/18/2000 | 12/18/2000 12:00:00 AM | P | PASS |
|
|
Robert ###-####. completed. 12/18/2000 4:58:47 PM
|
ELE00-04037
| Electrical Rough-In | 12/18/2000 | 12/18/2000 | 12/18/2000 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/18/2000 at 10:07:38. Contact: . 3rd floor; southend ceiling corridor & inner offices r/i. 12/18/2000 5:04:27 PM
|
ELE99-03610
| Final | 12/18/2000 | 12/18/2000 | 12/18/2000 12:00:00 AM | P | PASS |
|
|
FN-- DON ###-#### --CALL 1ST BEFORE INSP. completed. 12/18/2000 5:02:21 PM
|
ELE00-04669
| Electrical Rough-In | 12/18/2000 | 12/18/2000 | 12/18/2000 12:00:00 AM | P | PART |
|
|
r/i conference Tom ###-####. discussed service grounding, branch circuits. 12/18/2000 4:58:21 PM
|