FIR01-00476
| FIR-Aging Inspection | 12/18/2001 | 12/18/2001 | 12/18/2001 12:00:00 AM | | NR |
|
|
work in progress 12/20/2001 7:39:30 AM
|
FIR01-00470
| FIR-Aging Inspection | 12/18/2001 | 12/18/2001 | 12/18/2001 12:00:00 AM | | NR |
|
|
work in progress 12/18/2001 10:51:08 AM
|
BLD01-02689
| FIRE-Final Inspection | 12/17/2001 | 12/18/2001 | 12/18/2001 12:00:00 AM | A | PASS |
|
|
Fire life/safety finaled 12/18/2001 3:18:08 PM
|
BLD01-01785
| FIRE-Final Inspection | 12/17/2001 | 12/18/2001 | 12/18/2001 12:00:00 AM | A | FAIL |
|
|
remove thumb turn on main exit, remove thumb turn and key set on beer cave doors, install handle on inside of beer cave door, provide exit sign on main door, provide signs on emergency off switch, provide signs on gas pumps, have dave miller inspect fuel tanks, repair duct detectors and install building address 12/18/2001 11:03:00 AM
|
BLD01-01784
| FIRE-Final Inspection | 12/17/2001 | 12/18/2001 | 12/18/2001 12:00:00 AM | A | PASS |
|
|
life/safety finaled 12/18/2001 10:59:27 AM
|
FIR01-00413
| INSP-Alarm Testing | 12/18/2001 | 12/18/2001 | 12/18/2001 12:00:00 AM | P | FAIL |
|
|
provide air balance report for hood, rewire hvac units for immediate shutdown, test smoke detector over facp, install 17 AH batteries, change hood report to central station, provide sign on exterior alarm bell, provide remote led's for hvac units 12/18/2001 3:21:32 PM
|