BLD06-03318
| FIRE-Final Inspection | 12/18/2007 | 12/18/2007 | 12/18/2007 3:34:25 PM | P | PART |
|
|
Life safety inspection passed, final pending shell and core permit final.
|
BLD06-03317
| FIRE-Final Inspection | 12/18/2007 | 12/18/2007 | 12/18/2007 3:33:33 PM | P | PART |
|
|
Final pending shell BLD permit.
|
BLD06-03322
| FIRE-Final Inspection | 12/18/2007 | 12/18/2007 | 12/18/2007 3:31:37 PM | P | PART |
|
|
Inspection passed pending repair of the striker at the front door latch, final pending shell BLD permit.
|
FIR07-00305
| INSP-Final Inspection | 12/18/2007 | 12/18/2007 | 12/18/2007 3:27:57 PM | P | FAIL |
|
|
2nd floor damper needs adjustment to enable complete and reliable closure.
|
FIR07-00922
| INSP-Final Inspection | 12/18/2007 | 12/18/2007 | 12/18/2007 2:02:30 PM | P | PASS |
|
|
Fire sprinkler system modifications passed inspection, ceiling tiles at the office area to be re-installed today, permit finaled.
|
FIR07-00733
| INSP-Final Inspection | 12/18/2007 | 12/18/2007 | 12/18/2007 2:00:47 PM | P | PASS |
|
|
Fire sprinkler work completed satisfactory, noted SW heads of the type installed to be provided at the riser head box as discussed.
|
FIR07-00976
| INSP-Sprinkler Rough-in/Hydro | 12/18/2007 | 12/18/2007 | 12/18/2007 1:58:02 PM | P | PART |
|
|
UG fire supply line hydrostatic test passed.
|
FIR06-00838
| INSP-Final Inspection | 12/17/2007 | 12/18/2007 | 12/18/2007 12:17:35 PM | P | NR |
|
|
According to project history, the underground supply has not yet been witnessed for flushing as required. Per phone conversation, contractor is not prepared to complete flushing today and will reschedule for tomorrow.
|
BLD07-00052
| FIRE-Final Inspection | 12/17/2007 | 12/18/2007 | 12/18/2007 12:02:54 PM | A | FAIL |
|
|
A fire alarm permit will be required for alteration and extension of the existing building FA system to include notification within this tenant remodel-see fire code review comments and notes attatched to the approved plan set, also noted the scope of work as indicated is not complete- missing walls, doors and finishes at several locations particularly on the west side of the corridor.
|
FIR07-00714
| INSP-Final Inspection | 12/18/2007 | 12/18/2007 | 12/18/2007 11:55:34 AM | A | PASS |
|
|
Fire alarm modification passed field inspection, permit finaled.
|
FIR07-01001
| INSP-Final Inspection | 12/17/2007 | 12/18/2007 | 12/18/2007 11:35:05 AM | A | PASS |
|
|
Inspection passed, fire sprinkler permit finaled.
|
FIR07-00669
| FIR-Aging Inspection | 12/18/2007 | 12/18/2007 | 12/18/2007 10:00:36 AM | | DEFR |
|
|
Work in progress. Pending field inspection request.
|
FIR07-00450
| INSP-Alarm Testing | 12/12/2007 | 12/18/2007 | 12/18/2007 12:00:00 AM | P | CANC |
|
|
bill Phone #: ###-####
|