FIR08-00778
| INSP-Conference | 12/18/2008 | 12/18/2008 | 12/18/2008 4:09:57 PM | P | DONE |
|
|
I deferred the sprinkler design questions to tim frost. This is a fully sprinklered building but there is exposed wood in the above ceiling area.
|
BLD08-02329
| FIRE-Final Inspection | 12/18/2008 | 12/18/2008 | 12/18/2008 3:47:44 PM | P | PASS |
|
|
Life safety passed.
|
FIR08-00799
| INSP-Final Inspection | 12/18/2008 | 12/18/2008 | 12/18/2008 3:10:32 PM | P | PASS |
|
|
Permit finaled
|
BLD07-02644
| FIRE-Final Inspection | 12/18/2008 | 12/18/2008 | 12/18/2008 3:10:00 PM | P | PASS |
|
|
Life safety passed.
|
FIR08-00341
| INSP-Alarm Testing | 12/16/2008 | 12/18/2008 | 12/18/2008 3:08:47 PM | A | FAIL |
|
|
No inspection was performed today but a correction notice was left with Mark. The correction notice lists: Provide resubmittals showing the door mag/locks and test the interconnection with the fire alarm panel, the two amber strobes inside of and the two red strobes outside of the large preaction room are the incorrect candella as per the plans, all of the alarm interconnections with the existing and new preaction sprinkler systems need to be tested, the graphic annunciator is non-functional and needs to be tested/repaired, the alarm system for the large preaction room needs tested, the facp needs to be re-programmed to operate the preaction valves per review comment #3, provide tests reports reflecting the devices already tested as marked on the resubmitted plans and provide a completed/installed fire alarm system that is fully functional with a clear panel as per IFC 907.18.
|
FIR07-01031
| INSP-Sprinkler Rough-in | 12/17/2008 | 12/18/2008 | 12/18/2008 11:06:41 AM | P | PASS |
|
|
See the as-built plans for locations in the main lobby where sprinkler piping is ok to cover.
|
FIR08-00814
| INSP-Sprinkler Rough-in | 12/17/2008 | 12/18/2008 | 12/18/2008 10:58:15 AM | A | PASS |
|
|
permit finaled
|
FIR08-00584
| INSP-Alarm Testing | 12/17/2008 | 12/18/2008 | 12/18/2008 9:10:41 AM | A | PASS |
|
|
Permit finaled
|