ESC09-00756
| Site Preparation | 12/18/2009 | 12/18/2009 | 12/18/2009 3:16:31 PM | P | FAIL |
|
|
Correction Notice: (message to RP): Remove all concrete wash residual and re-install a concrete washout pit. Failure to comply will result in a Stop Work Order. Will re-inspect on 12/22/09AM.
|
ESC09-00086
| General Inspection | 12/17/2009 | 12/18/2009 | 12/18/2009 2:37:07 PM | A | CANC |
|
|
|
ESC08-00407
| BMP Violation | 12/3/2009 | 12/18/2009 | 12/18/2009 2:36:16 PM | A | CANC |
|
|
Stabilized
|
ESC09-00501
| Tracking Control | 12/18/2009 | 12/18/2009 | 12/18/2009 2:36:04 PM | A | FAIL |
|
|
Verbal message to RP: Need to install a stabilized construction exit at the point of access to the project area. Will re-inspect on 12/22/09am
|
ESC09-00554
| BMP Violation | 12/18/2009 | 12/18/2009 | 12/18/2009 2:27:42 PM | A | FAIL |
|
|
Verbal to GC: Clean up hard surfaces of all sediment and debris. Also in the lay down yard a stabilized construction exit is expected to be constructed. Will re-inspect on 12/22/09AM.
|
ESC09-00470
| BMP Violation | 12/17/2009 | 12/18/2009 | 12/18/2009 9:44:33 AM | A | FAIL |
|
|
Verbal correction/ confrence with RP and contractor: Clean up sediment and debris off of all hard surfaces from scouring erosion and tracking off of the hard surfaces. Also install sediment barriers where the scouring has occured and at the entance of project at the toe of both berms. Will re-inspect on 12/21/09AM.
|
ESC09-00765
| Site Preparation | 12/18/2009 | 12/18/2009 | 12/18/2009 9:30:44 AM | | NR |
|
|
|