BLD12-02591
| BLD-Final | 12/18/2012 | 12/18/2012 | 12/18/2012 3:16:07 PM | P | NR |
|
|
Devon Phone #: ###-#### Need Fire final insp.
|
GCB12-00151
| GCB-Final | 12/17/2012 | 12/18/2012 | 12/18/2012 3:14:32 PM | P | PASS |
|
|
need to call ahead for access ###-#### Not able to determine if all permits are finaled. Structural inspection only........OK.
|
BLD12-02797
| BLD-Footing | 12/17/2012 | 12/18/2012 | 12/18/2012 2:30:49 PM | P | PASS |
|
|
john - early afternoon if possible Phone #: ###-####
|
ESC12-01041
| Site Preparation | 12/18/2012 | 12/18/2012 | 12/18/2012 2:26:06 PM | P | PASS |
|
|
|
BLD12-03125
| BLD-Footing | 12/18/2012 | 12/18/2012 | 12/18/2012 1:45:21 PM | P | PART |
|
|
Dane Phone #: ###-#### String line pulled and appears Ok but Question about the origination of pins.
|
GCB12-00111
| GCB-Framing | 12/17/2012 | 12/18/2012 | 12/18/2012 1:09:44 PM | P | PASS |
|
|
Dylan @ ###-#### PM Inspection
|
BLD12-02027
| BLD-Wall Bracing | 12/17/2012 | 12/18/2012 | 12/18/2012 1:07:25 PM | A | FAIL |
|
|
Micah Phone #: ###-#### Need approved plan.
|
BLD12-01288
| BLD-Final | 12/17/2012 | 12/18/2012 | 12/18/2012 1:05:40 PM | A | PASS |
|
|
jessie please call 30 min before going out Phone #: ###-#### Conf. room lever handle for egress installed. OK for Perm Occ.
|
ESC12-01096
| Site Final | 12/11/2012 | 12/18/2012 | 12/18/2012 10:52:14 AM | A | NR |
|
|
Adam phone ###-#### check back.
|
ESC12-01096
| Site Final | 12/11/2012 | 12/18/2012 | 12/18/2012 10:51:53 AM | A | NR |
|
|
Adam phone ###-#### Check back.
|