BLD13-02931
| FIRE-Final Inspection | 12/18/2013 | 12/18/2013 | 12/18/2013 4:56:44 PM | P | PASS |
|
|
Fire life safety inspection passed.
|
FIR13-00647
| INSP-Final Inspection | 12/18/2013 | 12/18/2013 | 12/18/2013 4:56:05 PM | P | PASS |
|
|
Fire sprinkler permit work passed final walkthrough.
|
BLD12-01991
| FIRE-Final Inspection | 12/17/2013 | 12/18/2013 | 12/18/2013 4:36:17 PM | P | PASS |
|
|
Shell permit life safety inspection completed acceptable.
|
BLD13-03030
| FIRE-Final Inspection | 12/16/2013 | 12/18/2013 | 12/18/2013 4:35:08 PM | P | PASS |
|
|
Life safety inspection completed satisfactory.
|
BLD13-02538
| FIRE-Conference | 12/18/2013 | 12/18/2013 | 12/18/2013 4:34:00 PM | P | DONE |
|
|
On site conference with contractor regarding project related fire sprinkler and hood suppression system work.
|
FIR13-00619
| INSP-Final Inspection | 12/16/2013 | 12/18/2013 | 12/18/2013 11:29:29 AM | A | PASS |
|
|
Scope of fire alarm work passed inspection, permit final approved.
|
FIR13-00614
| INSP-Final Inspection | 12/16/2013 | 12/18/2013 | 12/18/2013 11:28:15 AM | A | PASS |
|
|
Fire alarm testing completed. Permit finaled.
|
FIR13-00654
| INSP-Sprinkler Rough-in | 12/17/2013 | 12/18/2013 | 12/18/2013 11:26:51 AM | A | PART |
|
|
Overhead work at the grid and sheetrock ceilings approved for cover. Need to provide walls to the deck or a drop ceiling with pendent coverage at the fire riser room.
|