BLD13-01332
| BLD-Final | 12/16/2013 | 12/17/2013 | | P | |
|
|
Tim Phone #: ###-####
|
BLD13-03427
| BLD-Footing | 12/19/2013 | 12/18/2013 | 12/20/2013 2:09:39 PM | A | PASS |
|
|
Phone #: 2084075065 >> Inspection requested via mobile web by Brandon Hild
|
BLD13-03068
| BLD-Footing | 12/18/2013 | 12/18/2013 | 12/20/2013 2:08:08 PM | P | PASS |
|
|
DOUG Phone #: ###-####
|
BLD13-02046
| BLD-Final | 12/18/2013 | 12/18/2013 | 12/19/2013 7:14:24 AM | P | NR |
|
|
austin Phone #: ###-#### needs step out back door
|
BLD13-02709
| BLD-Footing | 12/18/2013 | 12/18/2013 | 12/19/2013 7:13:36 AM | P | CANC |
|
|
anton Phone #: ###-#### Dave, Anton will call you when he is digging out the frost.
|
MIS13-00331
| BLD-Conference | 12/18/2013 | 12/18/2013 | 12/19/2013 7:13:12 AM | P | PASS |
|
|
removal and replacement of retaining wall over 4 ft tall, no permit. no one home at this address no sign of any work at this time there is a retainning wall on the east side of the prop about 20ft on the south end looks newer but this part of the wall only has about 2ft of soil def.
|
BLD13-03427
| BLD-Footing | 12/17/2013 | 12/18/2013 | 12/19/2013 7:07:26 AM | A | PART |
|
|
Phone #: 2084075065 >> Inspection requested via mobile web by Brandon Hild
|
BLD13-01637
| BLD-Energy code compliance | 12/17/2013 | 12/18/2013 | 12/19/2013 7:06:48 AM | A | PASS |
|
|
call when on way // Jason Phone #: ###-####
|
BLD13-01637
| BLD-Framing/Rough-in | 12/17/2013 | 12/18/2013 | 12/19/2013 7:06:23 AM | A | PASS |
|
|
call when on way // Jason Phone #: ###-####
|
BLD13-02756
| BLD-Framing/Rough-in | 12/17/2013 | 12/18/2013 | 12/19/2013 7:05:56 AM | A | PART |
|
|
Austin Phone #: ###-#### trusses have been fixed ok to insulate still needs to lift up duct work
|
BLD13-02671
| BLD-Wall Bracing | 12/17/2013 | 12/18/2013 | 12/19/2013 7:04:11 AM | A | PART |
|
|
Phone #: ###-#### >> Inspection requested via web by Braxton Hansen second level ok but ground floor portal framing still needs to be done.
|
BLD12-01991
| BLD-Final | 12/17/2013 | 12/18/2013 | 12/18/2013 3:07:52 PM | P | PASS |
|
|
Shell and Core Building Final Final with Dave Hannah, requested by Jamal, PM. Thanks. AKJ Phone #: ###-#### >> Inspection requested via web by Adam Johnson
|