Inspections for the day of: Thursday, December 18, 2014.
Number of inspections: 25
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD14-01480 BLD-Framing/Rough-in12/18/201412/18/201412/18/2014 3:53:28 PMPFAIL
Please call brian prior Phone #: ###-#### Inspection requested via web by Brian Stark. Box out electrical ground in 1hr. wall, provide 5/8 typex rock behind tub up stairs at 1hr. wall, fire caulk all penetrations in 1hr. wall. ok to insulate.
BLD13-03531 BLD-Wall Bracing12/18/201412/18/201412/18/2014 3:51:26 PMPPASS
Phone #: ###-#### Inspection requested via web by Brian Stark
BLD13-03530 BLD-Wall Bracing12/18/201412/18/201412/18/2014 3:51:11 PMPPASS
Phone #: ###-#### Inspection requested via web by Brian Stark
BLD13-03529 BLD-Wall Bracing12/18/201412/18/201412/18/2014 3:50:56 PMPPASS
Phone #: ###-#### Inspection requested via web by Brian Stark
BLD13-03528 BLD-Wall Bracing12/18/201412/18/201412/18/2014 3:50:40 PMPPASS
Shear Phone #: ###-#### Inspection requested via web by Brian Stark
BLD14-02065 BLD-Final12/18/201412/18/201412/18/2014 1:57:02 PMPDONE
Keith Phone #: ###-####
BLD14-02065 DOC - Permit Finaled12/18/201412/18/201412/18/2014 1:56:54 PMPPASS
BLD14-02281 BLD-Final12/18/201412/18/201412/18/2014 1:56:36 PMPPASS
Keith Phone #: ###-####
BLD14-02281 DOC - Permit Finaled12/18/201412/18/201412/18/2014 1:56:22 PMPPASS
The project has been finaled out with the TI permit. All associated trades and fire/life/safety have ben finaled.
BLD14-02095 BLD-Final12/18/201412/18/201412/18/2014 1:55:07 PMPCANC
Keith Phone #: ###-####
BLD14-02358 BLD-Final12/18/201412/18/201412/18/2014 1:53:53 PMPPASS
Jake Phone #: ###-####
BLD14-02358 DOC - Permit Finaled12/18/201412/18/201412/18/2014 1:53:40 PMPPASS
BLD13-03319 BLD-Wall Bracing12/17/201412/18/201412/18/2014 1:29:40 PMPPASS
Reinspection Phone #: ###-#### Inspection requested via web by Scott Zierler. All exterior shear ok.
BLD14-01579 BLD-Wall Bracing12/17/201412/18/201412/18/2014 12:06:17 PMADONE
sheer//Pat Phone #: ###-####
BLD14-02170 BLD-Framing/Rough-in12/17/201412/18/201412/18/2014 12:05:52 PMAFAIL
and sheer //Pat Phone #: ###-####. fireblock up stairs at dryer vents through top plates, lateral brace vtop chords at overbuild, box out bathroom vent fan at 1st floor floor ceiling. nail off all simpson hangars. ok to insulate.
BLD14-02170 BLD-Wall Bracing12/17/201412/18/201412/18/2014 12:03:16 PMAPASS
sheer //Pat Phone #: ###-####
BLD14-01590 BLD-Wall Bracing12/17/201412/18/201412/18/2014 11:38:04 AMAFAIL
sheer//Pat Phone #: ###-####. Several areas missed or not attached. recall when completed.
BLD14-01591 BLD-Wall Bracing12/17/201412/18/201412/18/2014 11:35:20 AMAPASS
sheer//Pat Phone #: ###-####
BLD14-01591 BLD-Energy code compliance12/17/201412/18/201412/18/2014 11:34:50 AMAPASS
Pat Phone #: ###-####
BLD14-02095 BLD-Final12/17/201412/18/201412/18/2014 10:51:54 AMAPASS
call from keith to change time//keith Phone #: ###-####. Ok for perm occ.
BLD14-02226 BLD-Final12/17/201412/18/201412/18/2014 9:52:40 AMAPASS
James Phone #: ###-####
BLD14-02226 DOC - Permit Finaled12/18/201412/18/201412/18/2014 9:52:29 AMPPASS
BLD14-03170 BLD-Conference12/17/201412/18/201412/18/2014 9:52:10 AMADONE
Burt Phone #: ###-####
BLD14-03237 BLD-Other12/17/201412/18/201412/18/2014 9:06:20 AMAPASS
DIANNA// BLOCK AND TIE Phone #: ###-####. Block and tie only ok.
BLD14-02350 BLD-Footing12/16/201412/18/201412/18/2014 8:55:17 AMAPART
phone call from Jim for the change//JIm Phone #: ###-####. Work in progress on remainder of exterior footings and loading dock footings. Pending special inspection.