Inspections for the day of: Friday, December 18, 2015.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD12-00599 BLD-Aging Inspection12/18/201512/18/201512/23/2015 9:42:10 AM DONE
BLD15-00454 BLD-Final12/18/201512/18/201512/18/2015 4:08:16 PMPPEND
would like call ahead; Josh Phone #: ###-####,, all ok,,, just needs hillside sign off
BLD15-02842 BLD-Conference12/18/201512/18/201512/18/2015 3:55:27 PMACANC
Please call Dutch 1/2 hr prior to arrival Thank you Phone #: ###-#### Inspection requested via web by Dennis Harmon,, out of time
BLD15-04328 BLD-Footing12/17/201512/18/201512/18/2015 3:49:45 PMPPART
would like call ahead; Brad Phone #: ###-####
BLD15-01300 BLD-Wall Bracing12/18/201512/18/201512/18/2015 3:35:16 PMPNR
Shear // Rick Phone #: ###-####,, walk through only,,, some covered,, ok,,, just needs tuned up in some areas
BLD15-00867 BLD-Final12/18/201512/18/201512/18/2015 3:28:04 PMPPEND
Brian Phone #: ###-####,, need trades,, walk through only,, need hillside sign off in history
BLD15-01173 BLD-Footing12/18/201512/18/201512/18/2015 2:15:26 PMPPART
Pat Phone #: ###-####,, lower ftgs ok to pour
BLD15-04315 BLD-Framing/Rough-in12/17/201512/18/201512/18/2015 2:12:37 PMAPASS
Gabe Phone #: ###-####,, ok to insulate
BLD12-02536 BLD-Conference12/17/201512/18/201512/18/2015 2:10:33 PMADONE
Cheryl Phone #: ###-####
BLD12-02536 DOC - Permit Finaled12/18/201512/18/201512/18/2015 2:09:45 PMPPASS
done
BLD15-00669 BLD-Framing/Rough-in12/17/201512/18/201512/18/2015 12:16:28 PMAPART
Kegan Phone #: ###-####,, work in progress,, ok to insulate