BLD00-02067
| BLD-Final | 12/18/2000 | 12/19/2000 | 12/19/2000 12:00:00 AM | A | PASS |
|
|
###-#### l/c final ok. 12/19/2000 10:22:54 AM
|
BLD00-02707
| BLD-Framing/Rough-in | 12/18/2000 | 12/19/2000 | 12/19/2000 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 12/18/2000 at 16:11:57. Contact: ###-####. web stifner at entry tji/joist replace garage floor bath 2nd/ fire blk at fire place/ nail girder in gerage north hip/ post to header east girder to header/ header at door at dinning rm hall/ 12/19/2000 9:44:53 AM
|
BLD00-02989
| BLD-Final | 12/19/2000 | 12/19/2000 | 12/19/2000 12:00:00 AM | P | PASS |
|
|
###-#### l/c isued on site final on stairs ok. 12/19/2000 5:02:01 PM
|
MIS00-00284
| BLD-Final | 12/19/2000 | 12/19/2000 | 12/19/2000 12:00:00 AM | P | PART |
|
|
fn corwin-- ###-#### fn m/h ok for blk.and tie down pending plm insp. 12/19/2000 3:09:23 PM
|
BLD00-01563
| BLD-Concrete | 12/18/2000 | 12/19/2000 | 12/19/2000 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 12/18/2000 at 07:27:04. Contact: ###-####. placed with special insp. pending report. 12/19/2000 3:10:00 PM 12/19/2000 3:10:11 PM
|