BLD00-03202
| FIRE-Conference | 12/19/2000 | 12/19/2000 | 12/21/2000 12:00:00 AM | P | FAIL |
|
|
Phil ###-####/// met with architect about exiting and occupant loads 12/21/2000 10:36:54 AM
|
BLD00-02658
| FIRE-Final Inspection | 12/19/2000 | 12/19/2000 | 12/21/2000 12:00:00 AM | P | FAIL |
|
|
PER PHIL FOR CONF/// met with architecft about exiting and occupant loads 12/21/2000 10:36:28 AM
|
BLD00-02659
| FIRE-Final Inspection | 12/19/2000 | 12/19/2000 | 12/21/2000 12:00:00 AM | P | FAIL |
|
|
PER PHIL FOR CONF//// met with architect about exiting and occupant loads 12/21/2000 10:36:06 AM
|
BLD99-03154
| FIRE-Final Inspection | 12/18/2000 | 12/19/2000 | 12/19/2000 12:00:00 AM | A | FAIL |
|
|
Harold ###-#### latching on supervisory and plans 12/20/2000 7:58:07 AM
|
BLD00-02774
| FIRE-Final Inspection | 12/19/2000 | 12/19/2000 | 12/19/2000 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 12/19/2000 at 11:04:30. Contact: ###-####.
|