PLM01-03931
| Plumbing Rough-in | 12/18/2001 | 12/19/2001 | 12/19/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 12/18/2001 at 11:31:43. Contact: ###-####.
|
PLM01-03497
| Final | 12/19/2001 | 12/19/2001 | 12/19/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 12/19/2001 at 08:10:27. Contact: ###-####. 12/20/2001 2:29:24 AM four union 12/20/2001 2:29:37 AM remove dilectric unions from brass to copper is creating dismilar metals not isolating them four unions two on water heater two on backflow set several sinks when tops get set every thing else looks ok 12/20/2001 2:33:57 AM
|
PLM01-03799
| Final | 12/19/2001 | 12/19/2001 | 12/19/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/19/2001 at 08:45:24. Contact: ###-####.
|
PLM01-03828
| Final | 12/19/2001 | 12/19/2001 | 12/19/2001 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 12/19/2001 at 08:46:05. Contact: ###-####.
|