BLD03-01468
| FIRE-Conference | 12/18/2003 | 12/19/2003 | 12/19/2003 12:00:00 AM | A | PART |
|
|
Dan; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes 12/19/2003 8:10:48 AM met with Dan and architect about deleting exit sign at main exit as it is clearly identifiable as an exit pending approval from strucutral inspector 12/19/2003 8:13:06 AM
|
BLD03-02909
| FIRE-Final Inspection | 12/18/2003 | 12/19/2003 | 12/19/2003 12:00:00 AM | A | PASS |
|
|
###-#### Dave; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes 12/19/2003 8:13:18 AM installed per plans; the GC said the owner is going to remove the pallet racks 12/19/2003 10:08:07 AM
|
BLD03-02763
| FIRE-Final Inspection | 12/19/2003 | 12/19/2003 | 12/19/2003 12:00:00 AM | A | FAIL |
|
|
main exit to be keyed both sides; door hardware on east and south exit doors; need ceiling tiles on second floor; repair exit sign located at hallway to second exit; attempted to locate fire sprinklering monitoring alarm panel - the owner believes the only panel is the ADT security panel that is monitoring the sprinkler system - the sprinkler monitoring system will require 24 hr battery back-up (note 4 on plan review); manual pull and smoke detector above panel and monitoring of the HVAC detectors in NAPA TI; there is one detector for HVAC shut down in the NAPA TI and there appears to be a total of three HVAC units in the TI space that would require detectors for unit shutdown 12/19/2003 10:17:01 AM
|
FIR03-00356
| INSP-Final Inspection | 12/19/2003 | 12/19/2003 | 12/19/2003 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 12/19/2003 at 11:14:59 AM. Contact: ###-####. need updated map; duct detectors aren't shutting units off 12/19/2003 4:52:49 PM
|
BLD03-00653
| FIRE-Final Inspection | 12/19/2003 | 12/19/2003 | 12/19/2003 12:00:00 AM | P | FAIL |
|
|
need door hardware; complete fire alarms 12/19/2003 4:59:26 PM
|
FIR03-00434
| INSP-Final Inspection | 12/19/2003 | 12/19/2003 | 12/19/2003 12:00:00 AM | P | PASS |
|
|
|
FIR03-00557
| INSP-Final Inspection | 12/19/2003 | 12/19/2003 | 12/19/2003 12:00:00 AM | P | PASS |
|
|
|
FIR02-00483
| INSP-Alarm Testing | 12/18/2003 | 12/19/2003 | 12/19/2003 12:00:00 AM | P | PASS |
|
|
cell ###-####; Phone #: ###-#### Internet Inspection Request from: Daniel Buccino
|
FIR03-00653
| INSP-Alarm Testing | 12/18/2003 | 12/19/2003 | 12/19/2003 12:00:00 AM | P | PASS |
|
|
cell ###-####; Phone #: ###-#### Internet Inspection Request from: Daniel Buccino
|
FIR03-00574
| INSP-Alarm Testing | 12/18/2003 | 12/19/2003 | 12/19/2003 12:00:00 AM | P | PASS |
|
|
cell ###-####; Phone #: ###-#### Internet Inspection Request from: Daniel Buccino
|
FIR03-00250
| INSP-Alarm Testing | 12/18/2003 | 12/19/2003 | 12/19/2003 12:00:00 AM | P | PART |
|
|
Let me know what will be a good time for you so that I can schedule my test.
Thanks Rick; Phone #: ###-#### Internet Inspection Request from: Rick Groom phased project and the south area is okay 12/19/2003 4:49:48 PM
|
FIR03-00616
| INSP-Sprinkler Rough-in | 12/19/2003 | 12/19/2003 | 12/19/2003 12:00:00 AM | P | PART |
|
|
Don; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes r/i for the branch lines at the peak and at the two lower levels on the first floor; will need to verify tenting prior to cover and insulation 12/19/2003 2:57:45 PM
|