BLD06-02350
| FIRE-Final Inspection | 12/18/2006 | 12/19/2006 | 12/19/2006 4:08:17 PM | P | PASS |
|
|
Life safety finaled
|
FIR06-00842
| INSP-Sprinkler Rough-in/Hydro | 12/19/2006 | 12/19/2006 | 12/19/2006 4:08:01 PM | P | PASS |
|
|
Sprinkler rough-in passed. Piping connecting the first and second floors has not been installed yet. No tenting has been done yet either.
|
BLD06-02339
| FIRE-Final Inspection | 12/19/2006 | 12/19/2006 | 12/19/2006 4:07:08 PM | P | FAIL |
|
|
No inspection performed. Fire sprinkler permit has not been called in yet for any inspections.
|
FIR05-00536
| INSP-Sprinkler Rough-in | 12/19/2006 | 12/19/2006 | 12/19/2006 2:57:50 PM | P | PASS |
|
|
Piping located in the folding door pockets in the auditorium is ok to be covered.
|
BLD06-00115
| FIRE-Conference | 12/18/2006 | 12/19/2006 | 12/19/2006 12:26:12 PM | A | DONE |
|
|
I went over fire lane painting with the contractor.
|
BLD06-03216
| FIRE-Final Inspection | 12/18/2006 | 12/19/2006 | 12/19/2006 10:11:03 AM | A | PASS |
|
|
Life safety finaled
|
BLD06-01026
| FIRE-Final Inspection | 12/19/2006 | 12/19/2006 | 12/19/2006 12:00:00 AM | A | CANC |
|
|
Scheduled by a contractor via Hello! on 12/19/2006 at 7:28:54 AM. Contact: ###-####.
|