Inspections for the day of: Tuesday, December 19, 2006.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD06-02350 FIRE-Final Inspection12/18/200612/19/200612/19/2006 4:08:17 PMPPASS
Life safety finaled
FIR06-00842 INSP-Sprinkler Rough-in/Hydro12/19/200612/19/200612/19/2006 4:08:01 PMPPASS
Sprinkler rough-in passed. Piping connecting the first and second floors has not been installed yet. No tenting has been done yet either.
BLD06-02339 FIRE-Final Inspection12/19/200612/19/200612/19/2006 4:07:08 PMPFAIL
No inspection performed. Fire sprinkler permit has not been called in yet for any inspections.
FIR05-00536 INSP-Sprinkler Rough-in12/19/200612/19/200612/19/2006 2:57:50 PMPPASS
Piping located in the folding door pockets in the auditorium is ok to be covered.
BLD06-00115 FIRE-Conference12/18/200612/19/200612/19/2006 12:26:12 PMADONE
I went over fire lane painting with the contractor.
BLD06-03216 FIRE-Final Inspection12/18/200612/19/200612/19/2006 10:11:03 AMAPASS
Life safety finaled
BLD06-01026 FIRE-Final Inspection12/19/200612/19/200612/19/2006 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 12/19/2006 at 7:28:54 AM. Contact: ###-####.