FIR11-00579
| INSP-Sprinkler Rough-in/Hydro | 12/19/2011 | 12/19/2011 | 12/19/2011 3:26:32 PM | P | PASS |
|
|
Wet and dry system hydro tests passed. The 24 hour air test was started at 2:00 with 42psi on the guage.
|
FIR11-00563
| INSP-Sprinkler Rough-in/Hydro | 12/16/2011 | 12/19/2011 | 12/19/2011 2:46:10 PM | A | PASS |
|
|
The hanger attachment points for the west side of central stairs at the 1st, 2nd and 3rd floors are ok to cover.
|
FIR11-00663
| INSP-Sprinkler Rough-in | 12/19/2011 | 12/19/2011 | 12/19/2011 2:43:49 PM | P | PASS |
|
|
sprinkler piping is ok to cover.
|