ELE11-02796
| Final | 12/16/2011 | 12/19/2011 | 12/19/2011 4:06:44 PM | P | FAIL |
|
|
call Mike to meet you there. Phone #: ###-#### >> Inspection requested via web by joel smith NEC 330.30 (C) MNC cable shall be suported within 12 inches of an box NEC 330.12(1) shall not be install were subject to physical damage, 1 1/4 from edge of framing member
|
ELE11-02692
| Electrical Rough-In | 12/16/2011 | 12/19/2011 | 12/19/2011 2:14:21 PM | P | PASS |
|
|
Contact: Garrett Collins - underground inspection please Phone #: ###-#### >> Inspection requested via web by Deb Gooden rough-in ok cover service underground
|
ELE11-02731
| Electrical Rough-In | 12/19/2011 | 12/19/2011 | 12/19/2011 1:31:30 PM | P | FAIL |
|
|
nick - ###-#### ceiling grid inspection,not all sizemic wires are in.
|
ELE11-02642
| Final | 12/15/2011 | 12/19/2011 | 12/19/2011 1:12:59 PM | A | PASS |
|
|
Bathroom final. Phone #: ###-#### >> Inspection requested via web by Greg Idsinga final ok
|
ELE11-02563
| Final | 12/16/2011 | 12/19/2011 | 12/19/2011 12:54:00 PM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Kathy Smith final ok
|
ELE11-01599
| Final | 12/16/2011 | 12/19/2011 | 12/19/2011 12:36:31 PM | A | PASS |
|
|
Inspection is on exterior building out back, you can access this from the street directly south of the job. The street comes off of walnut ave. Phone #: ###-#### >> Inspection requested via web by ERIC CENTERS final ok
|