GCB13-00146
| GCB-Framing | 12/18/2013 | 12/19/2013 | 12/19/2013 4:12:55 PM | P | FAIL |
|
|
Chee ###-####. Provide squash blocking under 2nd. floor framing for paralam above to transfer loads. Tighten holddown at5 east wall. Justify openings in inter shear panels. ok to insulate.
|
BLD13-03388
| BLD-Framing/Rough-in | 12/18/2013 | 12/19/2013 | 12/19/2013 3:16:36 PM | P | PASS |
|
|
Call for access Phone #: 2088708584 >> Inspection requested via mobile web by Jeremy Plantenga
|
GCB13-00149
| GCB-Shearwall | 12/19/2013 | 12/19/2013 | 12/19/2013 1:51:55 PM | P | PASS |
|
|
Willie ###-####
|
BLD13-01556
| BLD-Wall Bracing | 12/18/2013 | 12/19/2013 | 12/19/2013 12:04:30 PM | A | FAIL |
|
|
justin Phone #: ###-####. Install all missing blocking and restaple.
|
BLD13-02582
| BLD-Wall Bracing | 12/18/2013 | 12/19/2013 | 12/19/2013 12:02:48 PM | A | PASS |
|
|
justin Phone #: ###-####
|
BLD13-02706
| BLD-Footing | 12/18/2013 | 12/19/2013 | 12/19/2013 11:22:46 AM | A | PART |
|
|
kyle Phone #: ###-####. Loading dock footing and grade beam footing at main entry. Pending special inspection. Also went over cold weather conc. with contractor.
|
BLD13-02706
| BLD-Framing/Rough-in | 12/18/2013 | 12/19/2013 | 12/19/2013 11:21:14 AM | A | PASS |
|
|
kyle Phone #: ###-####. Interior steel stud framed walls (I walls) non moveable ok.
|
ESC13-01168
| Site Preparation | 12/19/2013 | 12/19/2013 | 12/19/2013 10:40:08 AM | A | DONE |
|
|
|
ESC13-01168
| DOC - Permit Finaled | 12/19/2013 | 12/19/2013 | 12/19/2013 10:39:58 AM | P | PASS |
|
|
|
BLD13-03198
| BLD-Final | 12/18/2013 | 12/19/2013 | 12/19/2013 10:39:38 AM | A | PASS |
|
|
Korry Phone #: ###-####
|
BLD13-03198
| DOC - Permit Finaled | 12/19/2013 | 12/19/2013 | 12/19/2013 10:39:27 AM | P | PASS |
|
|
|
BLD13-01688
| BLD-Framing/Rough-in | 12/18/2013 | 12/19/2013 | 12/19/2013 10:16:35 AM | A | PART |
|
|
CHARLES Phone #: ###-####. Top of wall for firewalls @ corridor on grids H and H.3 from 1 to 3.9 for phase 1 patient addition, pending electrical inspection. Steel stud framing for exterior walls at phase 1 part B. Also noted steel track at phase 1 patient addition has been shot down per the approved engineering.
|