Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC13-01231 General Inspection12/19/201412/19/201412/19/2014 3:39:32 PMPPASS
Boise Heights in progress. Rumble bar construction entrances are preventing trackout, no offsite discharges or dewatering operations occuring. Surrounding drop inlets all have DI protection.

Permit posted. No corrections required.
ESC14-00239 General Inspection12/19/201412/19/201412/19/2014 3:16:02 PM PASS
All drop inlets protected, no significant trackout to surrounding streets. Lined concrete washout onsite. No offsite or non-stormwater discharges. Permit posted. Sherwood Apt. complex currently in compliance.
ESC12-00130 General Inspection12/19/201412/19/201412/19/2014 3:06:37 PM PASS
River's Edge in progress. No trackout from site or employee parking area. Drop inlets protected. No discharges observed and no dewatering detected or reported.

Rear silt fence between site and Greenbelt is intact and trenched in.
ESC14-00438 General Inspection12/19/201412/19/201412/19/2014 1:20:44 PM PASS
MInor activity occuring on the interior at time of inspection. No sediment or turbid runoff during observed during the rain. Permit is posted, no trackout from vehicles, no trash or litter uncontained.

Approved.
ESC14-00503 General Inspection12/19/201412/19/201412/19/2014 12:48:47 PM PASS
WIP. Getting ready to pour driveway, no sediment leaving site and no trackout in Somerset Village. BMPs installed.

Need to use a lined washout with remaining capacity, the other day the old upper washout was used and it spilled over. See ESC13-00193 for details on Corrections.
ESC14-00624 Aging Inspection12/19/201412/19/201412/19/2014 12:31:48 PM PASS
ESC14-00530 General Inspection12/19/201412/19/201412/19/2014 11:10:45 AM PART
Beverly warehouse project is in progress. The first two warehouse frames have been erected and the parking lots and stormwater drainage have been constructed as well as the new channel/diversion for the irrigation drain that runs through site.

No trackout or erosion, onsite storm drains need inlet protection to protect underground seepage bed.

RP Kevin is now on new project, gave verbal correction to new site supervisor Phil who was onsite to install filter bags or mats. He said it will be done today.
ESC14-00045 General Inspection12/19/201412/19/201412/19/2014 10:47:04 AM PASS
Permit posted. No sediment leaving site, wattle installed at toe of bank. Sidewalk has been recently swept. No violations observed. Sand on road is from winter safety operations
ESC14-00531 Random Inspection12/19/201412/19/201412/19/2014 10:43:19 AMPPASS
WIP. Exterior frame is up, interior work ongoing. No trackout, permit posted, site is very clean with no trash or uncontained litter. No corrections required.
ESC14-00885 Random Inspection12/19/201412/19/201412/19/2014 10:25:36 AMAPASS
Greenbelt expansion path has been completed, including culvert installation for the two Council Springs Creek road crossings.

Final grading is in progress and the bare ground has not yet been hydroseeded or tacified. No major trackout. No water running in creek currently. Minimal activity at time of inspection.
ESC13-00230 General Inspection12/19/201412/19/201412/19/2014 10:13:03 AM PASS
Streets clean, drop inlets protected. Individual homes with seperate ESC permits. No corrections needed at this time. BMPs implemented.
ESC14-00903 Site Preparation12/18/201412/19/201412/19/2014 10:00:39 AMPPASS
Jeff Phone #: ###-####

GC Mark and foreman Jeff onsite staking out. Site is below grade of sidewalk and bank behind house so receives water rather than runoff. Main BMPs will be housekeeping, concrete washout, and trash containment. Workers to stay off mud.
ESC14-01108 Site Preparation12/19/201412/19/201412/19/2014 9:52:44 AMPPART
No site prep inspection or notification provided. Site was set up properly however.

Permit posted. Constractors staying off mud. DI protection is installed. Approved to continue, no other violations.
ESC14-01022 Site Preparation12/19/201412/19/201412/19/2014 9:49:27 AMAPART
Site setup properly but no site prep called.

Permit posted, drop inlet protection already installed by developer, silt fence trenched in at back of house to protect rocky drainage swale.

Correction:

Fix section of silt fence that is leaning over due to dirt pushing up against it. With rain mud and sand will run into swale.

Will check back Monday, called RP Jeff Wood and left message with correction.
ESC14-00157 General Inspection12/19/201412/19/201412/19/2014 8:55:33 AM PASS
WIP. Permit posted. Frame is up. No violations.