ELE13-03073
| Final | 12/19/2017 | 12/19/2017 | 12/19/2017 2:48:06 PM | P | PASS |
|
|
4 welder outlets...one circuit...one welder that is used at 4 locations...ok to final
|
ELE17-04250
| Final | 12/18/2017 | 12/19/2017 | 12/19/2017 2:46:49 PM | P | PASS |
|
|
Moved (4) Lifts Phone #: ###-#### Inspection requested via web by Matthew White...work complete...use of existing circuits...ok to final
|
ELE14-00471
| Final | 12/18/2017 | 12/19/2017 | 12/19/2017 2:16:50 PM | P | PASS |
|
|
installed (2) new lifts Phone #: ###-#### Inspection requested via web by Matthew White..outlets and circuit labels ok...ok to final permit work complete
|
ELE17-02649
| Electrical Rough-In | 12/18/2017 | 12/19/2017 | 12/19/2017 1:52:44 PM | P | PASS |
|
|
contact Andy CHambers Phone #: ###-#### Inspection requested via web by Scott Campbell.. wall cover ok as marked on plans
|
ELE17-04139
| Electrical Rough-In | 12/19/2017 | 12/19/2017 | 12/19/2017 1:16:16 PM | P | PASS |
|
|
Approval for cover on conference floor box. Phone #: ###-#### Inspection requested via web by Sean Patton....ok to cover underground for floor outlet
|
ELE17-03856
| Electrical Rough-In | 12/18/2017 | 12/19/2017 | 12/19/2017 12:14:57 PM | A | PASS |
|
|
grid ceiling inspection Phone #: ###-#### Inspection requested via web by Ryan Wake.... ok to cover ceiling...main entry and 3 offices
|
ELE17-04248
| Conference | 12/18/2017 | 12/19/2017 | 12/19/2017 11:31:09 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Christy Cheney....discussed lighting for paint booth. Paint booth is a used paint booth...existing lighting to be changed to LED...questions on classification of exterior and areas around exit doors
|
ELE17-04229
| Electrical Rough-In | 12/18/2017 | 12/19/2017 | 12/19/2017 10:36:01 AM | A | PASS |
|
|
Please call ahead so we can meet there onsite Phone #: ###-#### Inspection requested via web by Mike Leonard...UL listed equipment verified
|
ELE13-03086
| Final | 12/19/2017 | 12/19/2017 | 12/19/2017 10:29:07 AM | A | PASS |
|
|
no corrections needed inspected 11/5/13..ok to final
|
ELE13-03417
| Final | 12/19/2017 | 12/19/2017 | 12/19/2017 10:18:11 AM | P | PASS |
|
|
ok to final
|
ELE13-03449
| ELE-Aging Inspection | 12/19/2017 | 12/19/2017 | 12/19/2017 10:16:54 AM | | FAIL |
|
|
contractor needs to schedule inspections or verify no work was done under permit
|
ELE13-03450
| ELE-Aging Inspection | 12/19/2017 | 12/19/2017 | 12/19/2017 10:15:32 AM | | PASS |
|
|
finaled scheduled
|
ELE13-03450
| Final | 12/19/2017 | 12/19/2017 | 12/19/2017 10:15:15 AM | A | PASS |
|
|
ok to final....no corrections needed from inspection done 12/12/13
|
ELE13-03102
| ELE-Aging Inspection | 12/19/2017 | 12/19/2017 | 12/19/2017 10:13:03 AM | | PASS |
|
|
final scheduled...ok
|
ELE13-03102
| Final | 12/19/2017 | 12/19/2017 | 12/19/2017 10:12:45 AM | A | PASS |
|
|
corrections made...ok to final
|
ELE17-03839
| Final | 12/19/2017 | 12/19/2017 | 12/19/2017 10:06:51 AM | P | PASS |
|
|
Pls contact Barry (Electrician) ###-#### to meet onsite. Installation was performed today (12/18) and Rough In was thought to be scheduled however cannot locate on website. Thank you. Inspection requested via web by Christian Kilpatrick....labelling and OCPD ok
|
ELE17-03839
| Electrical Rough-In | 12/18/2017 | 12/19/2017 | 12/19/2017 10:06:22 AM | A | PASS |
|
|
Pls contact Barry (Electrician) ###-#### to meet onsite. Installation was performed today (12/18) and Rough In was thought to be scheduled however cannot locate on website. Thank you. Inspection requested via web by Christian Kilpatrick...UL listed equipment verified
|
ELE17-04191
| Rough-In Permanent Service | 12/18/2017 | 12/19/2017 | 12/19/2017 9:36:28 AM | A | PASS |
|
|
Unit should be open by 9:00 by general contractor. Phone #: ###-#### Inspection requested via web by David Nelson...p/s u/g new ok...rough in ok to cover
|
ELE17-03841
| Final | 12/14/2017 | 12/19/2017 | 12/19/2017 8:34:49 AM | A | PASS |
|
|
final for solar...line side tap...electrical all outside..labelling and OCPD ok
|