ELE18-04737
| Electrical Rough-In | 12/19/2018 | 12/19/2018 | 12/19/2018 3:14:21 PM | P | PASS |
|
|
Damon Rush Phone #: ###-#### Inspection requested via web by Damon Rush Raceway installations associated with elevator rough in ok cover.
|
ELE18-01330
| Final | 12/18/2018 | 12/19/2018 | 12/19/2018 12:55:25 PM | A | FAIL |
|
|
Please call 30min in advance so I can meet on site with you. Phone #: ###-#### Inspection requested via web by Casey Fouts 210.8- GFCI protection shall be provided for all 120 volt receptacle outlets up to 50 amp and other than 120 volt receptacles up to 100 amp. 300.11- Luminaires located in kitchen areas shall be supported independant of grid 300.15- Bath fan hanging from ceiling with splice not contained in a box. All aplices shall be contained in a box or enclosure. 422.31- A disconnecting means shall be provided for a appliances rated over 300 VA that shall be located with in 50' and with in sight of appliance. * All electrical power associated with hood shall be connected to ansil system to disconnect power in case of fire.
|
ELE18-03175
| Final | 12/19/2018 | 12/19/2018 | 12/19/2018 11:51:15 AM | A | PASS |
|
|
The home owners and workers will be there to let you in. Phone #: ###-#### Inspection requested via web by Jay Symonds Final ok
|
ELE18-04737
| Final | 12/18/2018 | 12/19/2018 | 12/19/2018 11:20:25 AM | A | NH |
|
|
Inspect portion Phone #: ###-#### Inspection requested via web by Damon Rush No answer, recall when available
|
ELE18-03802
| Electrical Rough-In | 12/18/2018 | 12/19/2018 | 12/19/2018 10:53:15 AM | A | PASS |
|
|
Randy. Ceiling cover. Phone #: ###-#### Inspection requested via web by Sean DeLacy Grid complete rough in ok cover
|
ELE18-03890
| Electrical Rough-In | 12/17/2018 | 12/19/2018 | 12/19/2018 10:52:31 AM | A | PASS |
|
|
A ceiling grid inspection is needed. Please call Lynn at ###-#### prior to arrival so that he can meet the inspector in the elevator. Thank you! Phone #: ###-#### Inspection requested via web by Lynn Proctor Offices grid rough in ok cover
|
ELE18-04413
| Final | 12/18/2018 | 12/19/2018 | 12/19/2018 9:53:07 AM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Barbara Szurgot 110.24- Available fault current shall be posted with value and date calculated. 210.63- A service receptacle outlet shall be installed with in 25' of outdoor AC unit and on mezz with in 25' of air handler. 314.25- Open j-box north wall warehouse for exhaust fan. 330.30- MC located on mezz shall be secured to wall. 406.6- GFCI receptacle located in warehouse bathroom shall have a cover. IBC- Power for emergency light shall not be controlled by a wall switch.
|