MEC18-06037
| Pressure Test | 12/19/2018 | 12/19/2018 | 12/19/2018 4:13:46 PM | P | PASS |
|
|
5lb flue pass
|
MEC18-06005
| Pressure Test | 12/19/2018 | 12/19/2018 | 12/19/2018 3:36:00 PM | P | PASS |
|
|
Please call technician on site in route Bill Doss ###-#### Phone #: ###-#### Inspection requested via web by Justin Osterhout- 5lb flue test pass
|
MEC18-06029
| Final | 12/18/2018 | 12/19/2018 | 12/19/2018 3:35:02 PM | A | PASS |
|
|
call homeowner half hour before coming Phone #:###-#### Inspection requested via web by Kim Lithander- furnace a/c coil co ok
|
MEC18-05863
| Final | 12/19/2018 | 12/19/2018 | 12/19/2018 3:08:09 PM | P | PASS |
|
|
|
MEC18-05863
| Pressure Test | 12/12/2018 | 12/19/2018 | 12/19/2018 3:07:15 PM | P | PASS |
|
|
PLEASE CALL BRIAN WHEN ON THE WAY ###-#### Phone #: ###-#### Inspection requested via web by Chris Field- 20lb gas pass from meter to range location
|
MEC18-05664
| Final | 12/17/2018 | 12/19/2018 | 12/19/2018 2:55:28 PM | P | FAIL |
|
|
Please call client prior to arrival ###-####.
Thank you Phone #: ###-#### Inspection requested via web by Andrea Grigsby- filter box doesnt let filter come out needs to be accessable- single wall flue needs 6" clear to combustibles on furnace flue needs to be ran in b vent- single layer bubble insulation doesnt meet r-6 value and needs to be installed per manufactures installation instruction with air gap
|
MEC18-05630
| Final | 12/17/2018 | 12/19/2018 | 12/19/2018 2:33:15 PM | P | FAIL |
|
|
Please call client prior to arrival at ###-#### Thank you Phone #: ###-#### Inspection requested via web by Andrea Grigsby- called number listed he said wife would be home- no access she didnt have time for inspection
|
MEC18-06022
| Final | 12/18/2018 | 12/19/2018 | 12/19/2018 2:14:12 PM | P | PASS |
|
|
INSTALLER ARCHIE ###-#### Phone #: ###-#### Inspection requested via web by Aaron Alandt- furnace a/c coil co ok
|
MEC18-05995
| Final | 12/19/2018 | 12/19/2018 | 12/19/2018 1:26:33 PM | P | PASS |
|
|
if questions call Jared @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann- 20lb gas pass to range
|
MEC18-05995
| Final | 12/19/2018 | 12/19/2018 | 12/19/2018 1:26:12 PM | P | PASS |
|
|
if questions call Jared @ ###-####. Phone #: ###-#### Inspection requested via web by Stacia Haumann- final ok
|
MEC18-05535
| Final | 12/18/2018 | 12/19/2018 | 12/19/2018 11:22:11 AM | A | PASS |
|
|
Contact is Brian Goodrich ###-#### Phone #: ###-#### Inspection requested via web by Jamie Scibior- final ok- card signed
|
MEC18-05982
| Pressure Test | 12/18/2018 | 12/19/2018 | 12/19/2018 10:56:09 AM | A | PASS |
|
|
re inspection Phone #: ###-#### Inspection requested via web by Randy Hart- 20lb gas pass
|
MEC18-05982
| Rough-in | 12/18/2018 | 12/19/2018 | 12/19/2018 10:55:35 AM | A | PASS |
|
|
re inspection Phone #: ###-#### Inspection requested via web by Randy Hart- R/I ok- fireplace R/I ok
|
MEC18-05982
| Rough-in | 12/19/2018 | 12/19/2018 | 12/19/2018 10:55:06 AM | A | PASS |
|
|
re inspection Phone #: ###-#### Inspection requested via web by Randy Hart- fireplace R/I ok
|
MEC18-06030
| Rough-in | 12/18/2018 | 12/19/2018 | 12/19/2018 10:11:32 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ashley Shoecraft- log set R/I ok
|
MEC18-06030
| Final | 12/19/2018 | 12/19/2018 | 12/19/2018 10:11:15 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ashley Shoecraft- log set final ok
|
MEC18-05479
| Final | 12/19/2018 | 12/19/2018 | 12/19/2018 10:10:51 AM | A | PASS |
|
|
gas piping final ok
|
MEC18-05995
| Final | 12/17/2018 | 12/19/2018 | 12/19/2018 9:49:55 AM | A | FAIL |
|
|
if questions call Jared @ ###-#### or Jerry @ ###-#### Phone #: ###-#### Inspection requested via web by Stacia Haumann- gauge below 20psi- need 2 shut off valves with open tee between them when tying into live gas line- recall in when corrections are made
|
MEC18-05977
| Pressure Test | 12/19/2018 | 12/19/2018 | 12/19/2018 9:25:43 AM | A | PASS |
|
|
20lb gas pass both units
|
MEC18-05977
| Rough-in | 12/18/2018 | 12/19/2018 | 12/19/2018 9:24:57 AM | A | PASS |
|
|
Duct blaster test 9:00. rough in, gas pressure test, flue and fireplace inspection. Phone #: ###-#### Inspection requested via web by ted roy- R/I both units ok- duct blast both units ok- fireplace R/I east unit ok
|
MEC18-05950
| Final | 12/17/2018 | 12/19/2018 | 12/19/2018 8:31:52 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mary LaFayette- furnace a/c coil co ok
|
MEC17-05665
| Mec-Aging Inspection | 12/19/2018 | 12/19/2018 | 12/19/2018 8:08:28 AM | | FAIL |
|
|
contractor needs to schedule final inspection
|