BLD96-02416
| INSP - Footings | 12/2/1996 | 12/2/1996 | 12/2/1996 12:00:00 AM | A | PASS |
|
|
|
BLD96-02152
| INSP - Framing/Rough-in | 11/27/1996 | 12/2/1996 | 12/2/1996 12:00:00 AM | A | PASS |
|
|
10:30
|
BLD96-02152
| INSP - Energy code compliance | 11/27/1996 | 12/2/1996 | 12/2/1996 12:00:00 AM | A | PASS |
|
|
10:30
|
BLD96-02880
| INSP - Framing/Rough-in | 11/27/1996 | 12/2/1996 | 12/2/1996 12:00:00 AM | A | PART |
|
|
interior walls ok after supporting top plate, ck on penetrations and incorrect ceiling assy of 1 hr corridor tunnel assy
|
BLD96-03028
| INSP - Framing/Rough-in | 11/27/1996 | 12/2/1996 | 12/2/1996 12:00:00 AM | A | NR |
|
|
approved plan not on site, interior walls looked ok, talked to one of the general contractors and they are to call @ top plate brace and to have approved plan on site for inspection..called Jim also
|
BLD96-03050
| INSP - Foundation | 12/2/1996 | 12/2/1996 | 12/2/1996 12:00:00 AM | P | NH |
|
|
no one could be found
|
BLD96-03183
| INSP - Site Preparation | 12/2/1996 | 12/2/1996 | 12/2/1996 12:00:00 AM | P | PART |
|
|
attempting to find pin as they are right at 3' to fence
|
BLD96-03183
| INSP - Conference | 12/2/1996 | 12/2/1996 | 12/2/1996 12:00:00 AM | P | PASS |
|
|
discussed fence & alley being out of square..finding pin
|
BLD96-03183
| INSP - Footings | 11/29/1996 | 12/2/1996 | 12/2/1996 12:00:00 AM | P | PART |
|
|
poured but looked ok
|
BLD96-03199
| INSP - Foundation | 12/2/1996 | 12/2/1996 | 12/2/1996 12:00:00 AM | P | PASS |
|
|
|
BLD96-02897
| INSP - Carpentry | 12/2/1996 | 12/2/1996 | 12/2/1996 12:00:00 AM | P | PART |
|
|
still do not have truss engineering fix or repairs on
|
BLD96-02953
| INSP - Footings | 12/2/1996 | 12/2/1996 | 12/2/1996 12:00:00 AM | P | PART |
|
|
repositoning dowel ends and placing dobbies for 3" clearance
|
BLD96-02277
| INSP - Final | 12/2/1996 | 12/2/1996 | 12/2/1996 12:00:00 AM | P | NH |
|
|
locked and no one there
|
BLD96-02429
| INSP - Foundation | 12/2/1996 | 12/2/1996 | 12/2/1996 12:00:00 AM | P | PART |
|
|
fnd.rebar walls partially done and those are ok
|
BLD96-02612
| INSP - Framing/Rough-in | 12/2/1996 | 12/2/1996 | 12/2/1996 12:00:00 AM | P | FAIL |
|
|
no mech, approved plan not on site, no inspection done
|
BLD96-02690
| INSP - Conference | 12/2/1996 | 12/2/1996 | 12/2/1996 12:00:00 AM | P | PART |
|
|
attempted to return Brandon's phone call
|
BLD96-02690
| INSP - Framing/Rough-in | 12/2/1996 | 12/2/1996 | 12/2/1996 12:00:00 AM | P | FAIL |
|
|
approved plan not on site, bcec infiltration not ready, no insp
|
BLD96-02757
| INSP - Footings | 12/2/1996 | 12/2/1996 | 12/2/1996 12:00:00 AM | P | CANC |
|
|
given to Carl
|
MEC96-03670
| INSP - Conference | 12/2/1996 | 12/2/1996 | 12/2/1996 12:00:00 AM | P | PART |
|
|
talked to Dave and mech contractor about unions in the attic. Dave was going to have them removed and recall
|
MEC96-03670
| INSP - Rough-in & Gas Pressure | 12/2/1996 | 12/2/1996 | 12/2/1996 12:00:00 AM | P | CANC |
|
|
asked Dave to look at quick disconnects in attic space
|
BLD95-01900
| INSP - Conference | 12/2/1996 | 12/2/1996 | 12/2/1996 12:00:00 AM | P | PASS |
|
|
PERMIT EXTENDED STILL DOING WORK- RAN OUT OF MONEY
|
BLD96-01284
| INSP - Framing/Rough-in | 12/2/1996 | 12/2/1996 | 12/2/1996 12:00:00 AM | P | CANC |
|
|
given to Carl
|
BLD96-01314
| INSP - Carpentry | 12/2/1996 | 12/2/1996 | 12/2/1996 12:00:00 AM | P | PASS |
|
|
shr nailing ok
|
BLD96-01314
| INSP - Framing/Rough-in | 11/27/1996 | 12/2/1996 | 12/2/1996 12:00:00 AM | P | NR |
|
|
|
BLD96-01314
| INSP - Conference | 12/2/1996 | 12/2/1996 | 12/2/1996 12:00:00 AM | P | PASS |
|
|
bcec does not apply, go forth w/insulation after other inspections and call for frame when done w/insulation
|
BLD96-01827
| INSP - Final | 12/2/1996 | 12/2/1996 | 12/2/1996 12:00:00 AM | P | PASS |
|
|
open all p.m . caulking garage wall elect outlets
|
BLD96-01827
| INSP - Letter of compliance | 12/2/1996 | 12/2/1996 | 12/2/1996 12:00:00 AM | P | PASS |
|
|
c/c issued
|
BLD96-01913
| INSP - Energy code compliance | 12/2/1996 | 12/2/1996 | 12/2/1996 12:00:00 AM | P | PASS |
|
|
|
BLD96-01913
| INSP - Framing/Rough-in | 12/2/1996 | 12/2/1996 | 12/2/1996 12:00:00 AM | P | PASS |
|
|
|
BLD96-02057
| INSP - Energy code compliance | 12/2/1996 | 12/2/1996 | 12/2/1996 12:00:00 AM | P | PASS |
|
|
|