PLM96-01704
| INSP - Final | 12/2/1996 | 12/2/1996 | 12/3/1996 12:00:00 AM | P | PASS |
|
|
12/02/96 347 - W/C 4 BASIN 7 TUB 3 SHR 2 SINK 1 W/B 1 W/H 1 L/T 1 SEWAGE PUMP 1
|
PLM96-02852
| INSP - Final | 12/2/1996 | 12/2/1996 | 12/3/1996 12:00:00 AM | P | PASS |
|
|
12/02/96 347 - LATE PM KEY IS ELEC OUTLET BY FRONT DOOR. W/C 3 BASIN 5 TUB 2 SHR 1 SINK 1 L/T 1 W/B 1 W/H 1
|
PLM96-03550
| INSP - Plumbing Rough-in | 12/2/1996 | 12/2/1996 | 12/2/1996 12:00:00 AM | | PASS |
|
|
/ / 347 - reinspection conference
|
PLM96-03560
| INSP - Sewer line | 12/2/1996 | 12/2/1996 | 12/2/1996 12:00:00 AM | | NR |
|
|
12/02/96 347 -
|
PLM96-03562
| INSP - Sewer and Water lines | 12/2/1996 | 12/2/1996 | 12/2/1996 12:00:00 AM | | PASS |
|
|
/ / 347 -
|
PLM96-03550
| INSP - Plumbing Rough-in | 11/27/1996 | 12/2/1996 | 12/2/1996 12:00:00 AM | A | FAIL |
|
|
12/02/96 347 - THE MODE BUILDING- 3RD FLOOR/ COMSTOCK AND BUSH LAW OFFIC west sink not not vented---copper pipes need protecttion from sheet metal
|
PLM96-03562
| INSP - Sewer and Water lines | 12/2/1996 | 12/2/1996 | 12/2/1996 12:00:00 AM | P | FAIL |
|
|
12/02/96 347 - sewer test failed
|
PLM96-03428
| INSP - Plumbing Rough-in | 12/2/1996 | 12/2/1996 | 12/2/1996 12:00:00 AM | P | PASS |
|
|
12/02/96 347 - w/c 2 basin 3 tub 1 shr 1 sink 1 w/b 1 w/h 1
|
PLM96-03476
| INSP - Sewer line | 12/2/1996 | 12/2/1996 | 12/2/1996 12:00:00 AM | P | PASS |
|
|
12/02/96 347 -
|
PLM96-02269
| INSP - Final | 12/2/1996 | 12/2/1996 | 12/2/1996 12:00:00 AM | P | FAIL |
|
|
12/02/96 347 - W/C 3 BASIN 5 TUB 2 SHR 2 SINK 1 W/B 1 W/H 1 L/T 1 DNSTRS BASIN NOT INSTALLED (PEDDESTAL) HOLE OPEN ON KIT. SINK
|
PLM96-03566
| INSP - Sewer and Water lines | 12/2/1996 | 12/2/1996 | 12/2/1996 12:00:00 AM | P | PASS |
|
|
12/02/96 347 -
|
PLM96-00756
| INSP - Final | 12/2/1996 | 12/2/1996 | 12/2/1996 12:00:00 AM | P | PASS |
|
|
12/02/96 347 - W/C 3 BASIN 5 TUB 2 SHR 1 SINK 1 W/B 1 W/H 1 L/T 1 W/S 1
|