Inspections for the day of: Thursday, December 2, 1999.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD99-02370 BLD-Final12/1/199912/2/199912/2/1999 12:00:00 AMAPASS
jeff ###-#### L/C issued.
BLD99-02776 BLD-Framing/Rough-in12/1/199912/2/199912/2/1999 12:00:00 AMAPART
jeff -- ###-#### re-insp fr Ok to insulate fire wall C/N.
BLD99-02777 BLD-Framing/Rough-in12/1/199912/2/199912/2/1999 12:00:00 AMAPART
jeff---- ###-#### re-insp fr Ok to insulate fire wall C/N.
BLD99-02779 BLD-Framing/Rough-in12/1/199912/2/199912/2/1999 12:00:00 AMAPART
feff-- ###-#### re-insp fr insp Truss bracing missing ok to insulate.
BLD99-02897 BLD-Framing/Rough-in12/1/199912/2/199912/2/1999 12:00:00 AMAPASS
jim-- ###-#### column steel First lift of East most column ok for rebar.
BLD99-02027 BLD-Footing12/2/199912/2/199912/2/1999 12:00:00 AMAPART
P/WO insp set backs ok.
BLD99-03280 BLD-Final12/2/199912/2/199912/2/1999 12:00:00 AMPFAIL
Dave ###-#### call first Voice mail, no answer unable to find contractor on site or contact.
BLD99-02180 BLD-Framing/Rough-in12/2/199912/2/199912/2/1999 12:00:00 AMPFAIL
shear wall dan ###-#### voice pager Sheer nailing C/N.
BLD99-03272 BLD-Energy code compliance12/2/199912/2/199912/2/1999 12:00:00 AMPPART
Mark ###-#### Insulation ok/frame ok need mech rough. Gyp all but bedroom ceiling until mech. Approval no return air or bath vent fan duct.
BLD99-02866 BLD-Framing/Rough-in12/2/199912/2/199912/2/1999 12:00:00 AMPPART
Ken Coffey ###-#### Fireblocking ceiling at kitchen/living ok to insulate.
BLD99-03459 BLD-Footing12/2/199912/2/199912/2/1999 12:00:00 AMPPASS
mike ###-#### Ft. ok.