BLD99-02370
| BLD-Final | 12/1/1999 | 12/2/1999 | 12/2/1999 12:00:00 AM | A | PASS |
|
|
jeff ###-#### L/C issued.
|
BLD99-02776
| BLD-Framing/Rough-in | 12/1/1999 | 12/2/1999 | 12/2/1999 12:00:00 AM | A | PART |
|
|
jeff -- ###-#### re-insp fr Ok to insulate fire wall C/N.
|
BLD99-02777
| BLD-Framing/Rough-in | 12/1/1999 | 12/2/1999 | 12/2/1999 12:00:00 AM | A | PART |
|
|
jeff---- ###-#### re-insp fr Ok to insulate fire wall C/N.
|
BLD99-02779
| BLD-Framing/Rough-in | 12/1/1999 | 12/2/1999 | 12/2/1999 12:00:00 AM | A | PART |
|
|
feff-- ###-#### re-insp fr insp Truss bracing missing ok to insulate.
|
BLD99-02897
| BLD-Framing/Rough-in | 12/1/1999 | 12/2/1999 | 12/2/1999 12:00:00 AM | A | PASS |
|
|
jim-- ###-#### column steel First lift of East most column ok for rebar.
|
BLD99-02027
| BLD-Footing | 12/2/1999 | 12/2/1999 | 12/2/1999 12:00:00 AM | A | PART |
|
|
P/WO insp set backs ok.
|
BLD99-03280
| BLD-Final | 12/2/1999 | 12/2/1999 | 12/2/1999 12:00:00 AM | P | FAIL |
|
|
Dave ###-#### call first Voice mail, no answer unable to find contractor on site or contact.
|
BLD99-02180
| BLD-Framing/Rough-in | 12/2/1999 | 12/2/1999 | 12/2/1999 12:00:00 AM | P | FAIL |
|
|
shear wall dan ###-#### voice pager Sheer nailing C/N.
|
BLD99-03272
| BLD-Energy code compliance | 12/2/1999 | 12/2/1999 | 12/2/1999 12:00:00 AM | P | PART |
|
|
Mark ###-#### Insulation ok/frame ok need mech rough. Gyp all but bedroom ceiling until mech. Approval no return air or bath vent fan duct.
|
BLD99-02866
| BLD-Framing/Rough-in | 12/2/1999 | 12/2/1999 | 12/2/1999 12:00:00 AM | P | PART |
|
|
Ken Coffey ###-#### Fireblocking ceiling at kitchen/living ok to insulate.
|
BLD99-03459
| BLD-Footing | 12/2/1999 | 12/2/1999 | 12/2/1999 12:00:00 AM | P | PASS |
|
|
mike ###-#### Ft. ok.
|