Inspections for the day of: Monday, December 2, 2002.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-02737 BLD-Foundation12/2/200212/2/200212/2/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 12/02/2002 at 06:21:47. Contact: ###-####.pw/oi 12/2/2002 4:14:44 PM
MEC02-03428 Rough-in12/2/200212/2/200212/2/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 12/02/2002 at 07:25:13. Contact: ###-####. need protection on flex pipe to be checked at framing. 12/2/2002 4:57:46 PM
MEC02-03428 Pressure Test12/2/200212/2/200212/2/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 12/02/2002 at 07:25:28. Contact: ###-####.
BLD02-02736 BLD-Footing12/2/200212/2/200212/2/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 12/02/2002 at 08:12:09. Contact: ###-####.passed by 421 steve webb called to tell me. save a trip. 12/2/2002 1:28:36 PM
BLD02-02635 BLD-Framing/Rough-in12/2/200212/2/200212/2/2002 12:00:00 AMPPASS
late pm ###-####
MEC02-03536 Rough-in12/2/200212/2/200212/2/2002 12:00:00 AMPFAIL
rich-- ###-####4 inch dryer duct in 3 1/2 wall/ ref lineset kinked at attic osb in garage maintane insulation. 12/3/2002 9:48:20 AM
BLD02-02635 BLD-Energy code compliance12/2/200212/2/200212/2/2002 12:00:00 AMPPASS
BLD02-02611 BLD-Framing/Rough-in11/29/200212/2/200212/2/2002 12:00:00 AMPFAIL
###-#### call first for access c/n need hvac and fire place/ engineering for laderal design and colum design / strap 2 nd floor bearing walls/ 2 member post under mlbeam to ft, 12/2/2002 2:27:31 PM