MEC02-00863
| Final | 11/27/2002 | 12/2/2002 | 12/2/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 11/27/2002 at 11:48:05. Contact: ###-####.---front door unlocked at 8;00 C/N posted--need shut off on fireplace on 2nd floor. Placed sticker on furnace. 12/2/2002 8:55:20 AM
|
BLD02-02881
| BLD-Framing/Rough-in | 11/29/2002 | 12/2/2002 | 12/2/2002 12:00:00 AM | A | PART |
|
|
JOSH SHEAR NAIL; Phone #: ###-#### Internet Inspection Request from: Darla Downs Garage area and rear of house--ok to side--Eng. (AHJ--Keith Jones) approving covered areas provided. Additional shear inspection will be needed at later date. 12/2/2002 10:01:50 AM
|
BLD02-02738
| BLD-Footing | 12/2/2002 | 12/2/2002 | 12/2/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 12/02/2002 at 08:11:06. Contact: ###-####. wip-form boards in excavation. 2% ready at time of inspection. 12/2/2002 2:22:38 PM
|
MEC02-02751
| Final | 12/2/2002 | 12/2/2002 | 12/2/2002 12:00:00 AM | P | NH |
|
|
###-#### No access -- correction notice--no inspection performed. 12/2/2002 2:25:17 PM
|
BLD02-02481
| BLD-Framing/Rough-in | 12/2/2002 | 12/2/2002 | 12/2/2002 12:00:00 AM | P | NR |
|
|
sheer ###-#### brad No approved plans on site--no shear inspection was performed--Conference per builders request--eng. from truss manufacture on trusses both sides of stairs to bonus room will be required for framing inspection. 12/2/2002 3:08:50 PM
|
BLD02-02771
| BLD-Framing/Rough-in | 12/2/2002 | 12/2/2002 | 12/2/2002 12:00:00 AM | P | PART |
|
|
###-#### rick siding panel inspect Shear--Ok to side, corrections made while inspector was on site. 12/2/2002 3:47:37 PM
|