Inspections for the day of: Tuesday, December 2, 2003.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM03-03747 Water and/or Sewer12/1/200312/2/200312/2/2003 12:00:00 AMAPART
###-#### Jim Strong tie in at meter ok to cover, homeowner needs a permit for work inside the building, maybe just change this permit to homeowner permit. 12/2/2003 10:17:51 AM
PLM03-02895 Final12/1/200312/2/200312/2/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 12/1/2003 at 3:53:58 PM. 3- lavs and 2- wsc 2- tub/showers, 1-sink final ok 12/2/2003 9:38:29 AM
PLM03-03662 Plumbing Rough-in12/1/200312/2/200312/2/2003 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 12/1/2003 at 8:20:55 AM. waste and water to eyewash, terry- what are the two c.i. wast lines in the ceiling of this place. 12/2/2003 9:14:11 AM
PLM03-03745 Water and/or Sewer12/1/200312/2/200312/2/2003 12:00:00 AMPCANC
###-#### Bob
PLM03-03753 Plumbing Rough-in12/2/200312/2/200312/2/2003 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 12/2/2003 at 7:44:27 AM. Contact: ###-####. gw ok 12/2/2003 4:01:58 PM
PLM03-02814 Final12/2/200312/2/200312/2/2003 12:00:00 AMPPASS
julio---call 1st before insp ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie final ok 12/2/2003 3:23:10 PM
PLM03-03756 Water and/or Sewer12/2/200312/2/200312/2/2003 12:00:00 AMPPASS
john ###-#### sw final ok 12/2/2003 2:21:08 PM
PLM03-03757 Water and/or Sewer12/2/200312/2/200312/2/2003 12:00:00 AMPPASS
john ###-#### sw final ok 12/2/2003 2:21:23 PM
PLM03-03758 Water and/or Sewer12/2/200312/2/200312/2/2003 12:00:00 AMPPASS
john ###-#### sw final ok 12/2/2003 2:21:48 PM
PLM03-03759 Water and/or Sewer12/2/200312/2/200312/2/2003 12:00:00 AMPPART
john ###-#### water ok sewer is attached to an existing stub that appears to be located on the neighbors lot, hold final untill sewer is relocated or an easement is filed and inspection of the existing sewer is complete. 12/2/2003 2:23:54 PM
PLM03-03437 Plumbing Rough-in12/2/200312/2/200312/2/2003 12:00:00 AMPPASS
###-#### Rob --- would like late afternoon please, thanks.
ri ok 12/2/2003 4:38:07 PM
PLM03-03745 Final12/2/200312/2/200312/2/2003 12:00:00 AMPPASS
final ok 12/2/2003 3:24:51 PM