BLD03-01362
| FIRE-Final Inspection | 12/1/2003 | 12/2/2003 | 12/2/2003 12:00:00 AM | A | FAIL |
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Darla Downs conference about the exit landing; relayed IBC requirement for landings at exterior exits; they will provide landing and schedule with AEI for the alarm test when ready 12/2/2003 9:12:26 AM
|
FIR03-00448
| INSP-Sprinkler Rough-in/Hydro | 12/1/2003 | 12/2/2003 | 12/2/2003 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 12/1/2003 at 2:45:36 PM. UG flush only okay 12/2/2003 8:35:11 AM
|
FIR03-00347
| INSP-Sprinkler Rough-in/Hydro | 12/1/2003 | 12/2/2003 | 12/2/2003 12:00:00 AM | A | NR |
|
|
never received call from Moke that the hydro test was ready 12/3/2003 1:40:34 PM
|
BLD03-02372
| FIRE-Final Inspection | 12/1/2003 | 12/2/2003 | 12/2/2003 12:00:00 AM | A | PASS |
|
|
john; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
|
BLD03-02450
| FIRE-Final Inspection | 12/1/2003 | 12/2/2003 | 12/2/2003 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 12/1/2003 at 3:55:20 PM. Contact: ###-####.
|
BLD03-00758
| FIRE-Final Inspection | 12/1/2003 | 12/2/2003 | 12/2/2003 12:00:00 AM | A | FAIL |
|
|
Jim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes needs address 12/2/2003 10:40:28 AM
|
BLD03-01742
| FIRE-Supply Line Cover | 12/1/2003 | 12/2/2003 | 12/2/2003 12:00:00 AM | A | FAIL |
|
|
Jim; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes needs extinguisher hung 12/2/2003 10:40:39 AM
|
FIR03-00733
| INSP-Final Inspection | 12/2/2003 | 12/2/2003 | 12/2/2003 12:00:00 AM | P | PASS |
|
|
|
FIR03-00651
| INSP-Supply line flush | 12/2/2003 | 12/2/2003 | 12/2/2003 12:00:00 AM | P | FAIL |
|
|
Mike; Phone #: ###-#### Internet Inspection Request from: Aimee Hughes no inspection performed under this permit; awaiting shell and core overhead plan resubmittals 12/2/2003 3:31:19 PM
|
FIR03-00651
| INSP-Sprinkler Rough-in/Hydro | 12/2/2003 | 12/2/2003 | 12/2/2003 12:00:00 AM | P | FAIL |
|
|
Mike; Phone #: ###-#### Please call first to coordinate with United Water, thanks. Internet Inspection Request from: Aimee Hughes no inspection performed under this permit; awaiting shell and core overhead plan resubmittals 12/2/2003 3:31:42 PM
|
MIS03-00227
| FIR-Final | 12/2/2003 | 12/2/2003 | 12/2/2003 12:00:00 AM | P | PASS |
|
|
STEVEN-- ###-#### items corrected 12/2/2003 2:25:09 PM
|
BLD03-02205
| FIRE-Final Inspection | 12/2/2003 | 12/2/2003 | 12/2/2003 12:00:00 AM | P | PASS |
|
|
|
FIR03-00474
| INSP-Supply line flush | 12/2/2003 | 12/2/2003 | 12/2/2003 12:00:00 AM | P | PASS |
|
|
UG flush only okay 12/2/2003 3:36:44 PM
|
FIR03-00500
| INSP-Final Inspection | 11/25/2003 | 12/2/2003 | 12/2/2003 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 11/25/2003 at 12:13:22 PM. Contact: ###-####. 17.2 amp hr batteries are installed, not the 18 amp hr shown on plans and 10 amp hr are required per plans; two additional RTU's will be installed in the future; address 12-16 were used instead of 5-8 12/2/2003 2:00:47 PM
|