ELE07-03617
| ELE-Aging Inspection | 12/2/2009 | 12/2/2009 | 12/4/2009 9:29:13 AM | | DONE |
|
|
no activity
|
ELE07-03657
| ELE-Aging Inspection | 12/2/2009 | 12/2/2009 | 12/4/2009 9:28:46 AM | | DONE |
|
|
no activity
|
ESC09-00350
| General Inspection | 12/2/2009 | 12/2/2009 | 12/2/2009 4:15:00 PM | P | PASS |
|
|
looked ok
|
ESC09-00660
| General Inspection | 12/2/2009 | 12/2/2009 | 12/2/2009 3:53:58 PM | P | PASS |
|
|
looked ok
|
ESC09-00703
| General Inspection | 12/2/2009 | 12/2/2009 | 12/2/2009 3:40:58 PM | P | PASS |
|
|
looked ok
|
ESC09-00592
| General Inspection | 12/2/2009 | 12/2/2009 | 12/2/2009 3:40:20 PM | P | PASS |
|
|
looked ok
|
ESC09-00521
| General Inspection | 12/2/2009 | 12/2/2009 | 12/2/2009 3:39:39 PM | P | PASS |
|
|
looked ok
|
ELE09-02334
| Conference | 12/2/2009 | 12/2/2009 | 12/2/2009 3:38:58 PM | P | DONE |
|
|
Tara Deiss ###-####//before 4pm please Tthey asked 370 what size wire to use for hot tub, but 370 said that sinnce they were the contractor that they would have to follow the requirements of the NEC. The tub was not open, so could not see nameplate for full load. Told them that they had to ensure listing, follow NEC 680, 340, 310, etc. Told them that we can only inspect work done, not do design. Told to call for ri once u/g is open and unit ready for inspection, no esc this project
|
ELE09-02333
| Electrical Rough-In | 12/2/2009 | 12/2/2009 | 12/2/2009 3:28:25 PM | P | PASS |
|
|
Dave Phone #: ###-#### walls only ok to cover, left correction notice to clean up ceiling per NEC 725.25, 300.11(A)
|
ELE09-02047
| Final | 12/2/2009 | 12/2/2009 | 12/2/2009 3:21:28 PM | P | PASS |
|
|
Chuck Phone #: ###-#### ok to final, no esc this project
|
ELE09-02201
| Final | 12/2/2009 | 12/2/2009 | 12/2/2009 2:29:10 PM | P | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Rowdy Monroe called, ok to final
|
ELE09-02303
| Rough-In Permanent Service | 12/2/2009 | 12/2/2009 | 12/2/2009 2:04:58 PM | P | PASS |
|
|
Thank you!! Phone #: ###-#### Internet Inspection Request from: Tracy Robertson ric ok, p/s u/g n ok
|
ELE09-02101
| Electrical Rough-In | 12/1/2009 | 12/2/2009 | 12/2/2009 1:18:17 PM | P | PASS |
|
|
trent Phone #: ###-#### ric ok
|
ELE09-02306
| Permanent Service | 12/1/2009 | 12/2/2009 | 12/2/2009 12:43:54 PM | P | PASS |
|
|
Jess Phone #: ###-#### look at ground and branch circuits at final, p/s o/h rec ok, no esc this project
|
ELE09-02298
| Final | 12/1/2009 | 12/2/2009 | 12/2/2009 10:50:00 AM | A | PASS |
|
|
Service change wnt well, Please call me when you are on your way so i can walk you through the project. TThank You so much. Dave Phone #: ###-#### Internet Inspection Request from: jason shifflett ok to final
|
ELE09-02328
| Conference | 12/1/2009 | 12/2/2009 | 12/2/2009 10:15:17 AM | A | DONE |
|
|
Ron- Late AM Please, call prior to going to meet Phone #: ###-#### talked about install of smoke detectors for 5 rooms, told owner to call for ri before install detectors so we can see boxes and conductors for free length, may do final at same time, but that depends on what ri looks like, no esc this project
|
ELE09-01932
| Electrical Rough-In | 12/1/2009 | 12/2/2009 | 12/2/2009 10:07:29 AM | A | CANC |
|
|
This is for a final on phase 4 only. Nick is the contact his no. is ###-####. Phone #: ###-#### Internet Inspection Request from: Shawna Gates see part final for phase 4
|
ELE09-01932
| Final | 12/2/2009 | 12/2/2009 | 12/2/2009 10:07:16 AM | A | PART |
|
|
This is for a final on phase 4 only. Nick is the contact his no. is ###-####. Phone #: ###-#### Internet Inspection Request from: Shawna Gates ok to final phase 4
|
ELE09-01767
| Electrical Rough-In | 12/1/2009 | 12/2/2009 | 12/2/2009 10:05:36 AM | A | PASS |
|
|
Chris is the contact his no is ###-####. Phone #: ###-#### Internet Inspection Request from: Shawna Gates elevator room walls and ceiling only ok to cover
|
ELE09-02317
| Temporary Service | 12/1/2009 | 12/2/2009 | 12/2/2009 9:22:12 AM | A | PASS |
|
|
Phone #: ###-#### Internet Inspection Request from: Bob Glenn called, t/s u/g n ok, no esc this project
|
ELE09-02307
| Permanent Service | 12/1/2009 | 12/2/2009 | 12/2/2009 8:37:53 AM | A | PASS |
|
|
Gary Phone #: ###-#### p/s o/h rec ok, no esc this project
|
ELE09-02305
| Final | 12/1/2009 | 12/2/2009 | 12/2/2009 8:03:16 AM | A | PASS |
|
|
robert Phone #: ###-#### ok to final, no esc this project
|
ELE09-02305
| Permanent Service | 12/2/2009 | 12/2/2009 | 12/2/2009 8:02:43 AM | A | PASS |
|
|
robert Phone #: ###-#### corrections made, p/s o/h n ok, no esc this project
|