Inspections for the day of: Thursday, December 2, 2010.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBob Reichert
TitleELE-INSPECTOR
Phone #794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE10-01591 ELE-Aging Inspection12/2/201012/2/201012/3/2010 6:31:38 AM DONE
see final
ELE10-01561 ELE-Aging Inspection12/2/201012/2/201012/3/2010 6:30:07 AM DONE
suc
ESC10-00745 General Inspection12/2/201012/2/201012/3/2010 6:28:34 AMADONE
looked ok, too much snow
ELE10-02104 Electrical Rough-In12/2/201012/2/201012/2/2010 2:36:52 PMPPASS
Phone #: ###-#### >> Inspection requested via web by Thomas Jenkins ok cover ceiling, find listing for ups and cooler
ELE10-02625 Electrical Rough-In12/2/201012/2/201012/2/2010 1:05:43 PMPPASS
Partial electrical rough-in phase 1 Phone #: ###-#### >> Inspection requested via web by Celinda Winters walls only ok for phase 1
ELE10-01761 Final12/1/201012/2/201012/2/2010 10:39:45 AMAPASS
Need to final this blanket for transform solar Bob. Thanks Phone #: ###-#### >> Inspection requested via web by Ken Heller ok final
ELE10-02191 Final12/1/201012/2/201012/2/2010 10:28:12 AMAPASS
Need to final third floor remodel Bob. Thanks Phone #: ###-#### >> Inspection requested via web by Ken Heller ok final
ELE10-02190 Final12/1/201012/2/201012/2/2010 10:27:37 AMAPASS
Need to final snd floor remodel Bob. Thanks Phone #: ###-#### >> Inspection requested via web by Ken Heller ok final
ELE10-02508 Final11/30/201012/2/201012/2/2010 10:25:25 AMAPASS
Bob, this is a clean room remodel in Building 24A that is ready for a final. Phone #: ###-#### >> Inspection requested via web by Eric Landberg ok final
ELE10-02628 Electrical Rough-In12/1/201012/2/201012/2/2010 10:24:49 AMAPASS
>> Inspection requested via web by Stuart Welton ri ok
ELE10-02633 Final12/2/201012/2/201012/2/2010 10:24:19 AMAPASS
this permit is just to get the occupancy. the work was all done on the vanilla TI permit. Snake River Electric has another permit to finish Bull Frog .com Verizon. so i have no more work to be done. call with questions. Bob was there yesterday and finaled the work that i have done. the door is open at 9 am. Phone #: ###-#### >> Inspection requested via web by Don Lustig ok final, signed card
ELE10-02628 Final12/2/201012/2/201012/2/2010 10:23:02 AMPPASS
>> Inspection requested via web by Stuart Welton ok