FIR11-00605
| INSP-Sprinkler Rough-in | 12/1/2011 | 12/2/2011 | 12/2/2011 2:48:12 PM | P | PASS |
|
|
Sprinkler piping is ok to cover.
|
FIR11-00479
| INSP-Sprinkler Rough-in | 12/1/2011 | 12/2/2011 | 12/2/2011 2:11:00 PM | A | PART |
|
|
The overhead piping in the new addition area is complete except for the drops and the Main Entry area. These two items will need to be inspected when completed prior to a cover being given to cover the piping with the lay-in ceiling tile. The sprinkler piping above the hard lid areas of the new addition is ok for cover. The installation so far matches the provided as-builts. The city approved plans were not available and will need to be provided prior to any more inspections.
|
BLD11-02799
| FIRE-Conference | 12/1/2011 | 12/2/2011 | 12/2/2011 1:36:02 PM | A | PASS |
|
|
Went over sprinkler and emergency light requirements with heather Phone #: ###-####
|
FIR11-00332
| INSP-Final Inspection | 12/1/2011 | 12/2/2011 | 12/2/2011 8:55:28 AM | A | CANC |
|
|
Call Doug Funk at above # 30 minutes prior to inspection Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|
FIR11-00610
| INSP-Sprinkler Rough-in/Hydro | 12/1/2011 | 12/2/2011 | 12/2/2011 8:36:19 AM | P | CANC |
|
|
Call Doug Funk at the # above 30 minutes prior to inspection Phone #: ###-#### >> Inspection requested via web by Sam Ball Inspection cancelled from web by: Sam Ball
|