ESC11-00192
| General Inspection | 11/29/2011 | 11/29/2011 | | | |
|
|
|
ESC11-00848
| Site Preparation | 12/2/2011 | 12/2/2011 | 12/9/2011 2:44:08 PM | | PASS |
|
|
job site, gutters clean. wooden is down, conrete blocks on site
|
ELE11-02716
| Temporary Service | 12/2/2011 | 12/2/2011 | 12/2/2011 2:07:41 PM | P | FAIL |
|
|
Thank You. Phone #: ###-#### >> Inspection requested via web by Rowdy Monroe NEC 110.26(A) Working space
|
ELE11-02705
| Electrical Rough-In | 12/2/2011 | 12/2/2011 | 12/2/2011 1:44:45 PM | P | PASS |
|
|
the 523 address is on the inside of the building on the tenant door//Lynn ###-#### rough-in ok cover walls No address on outside of building, required for final
|
ELE11-02587
| Final | 12/2/2011 | 12/2/2011 | 12/2/2011 1:28:56 PM | P | PASS |
|
|
WARREN Phone #: ###-#### final ok
|
ELE11-02594
| Permanent Service | 12/1/2011 | 12/2/2011 | 12/2/2011 1:14:06 PM | P | PASS |
|
|
anne - please call 1/2 hr prior Phone #: ###-#### p/s o/h rec ok Homline breaker needs to be changed out to bryant brand, Service grounding conductor Shall be attached to ground rods with aproved manner
|
ELE11-02717
| Temporary Service | 12/2/2011 | 12/2/2011 | 12/2/2011 12:37:11 PM | P | CANC |
|
|
Thank you. Phone #: ###-#### >> Inspection requested via web by Rowdy Monroe Inspection cancelled from web by: Rowdy Monroe
|
ELE11-02665
| Electrical Rough-In | 12/1/2011 | 12/2/2011 | 12/2/2011 12:36:00 PM | A | PASS |
|
|
contact is Geoff Hannaford ###-#### Phone #: ###-#### >> Inspection requested via web by Debby Ellis rough-in ok cover
|
ELE08-02464
| Final | 12/1/2011 | 12/2/2011 | 12/2/2011 9:51:27 AM | A | FAIL |
|
|
early as possible, at least before 10:30 --Joe ###-#### Corrections not done Conduits at service need straped,empty breaker spaces require blank covers, breaker tie, label panel, install ko plugs in j-box, identify current carring conductor
|
ELE11-02699
| Electrical Rough-In | 12/1/2011 | 12/2/2011 | 12/2/2011 9:00:55 AM | A | PASS |
|
|
INSPECTION FOR THE UNDERGROUND N THE PUMP STATION AND TO A PRV VAULT. MORE UNDERGROUNG TO FOLLOW BUT THE OCNTRACTOR IS TRYING TO POUR THE FLOOR AREA. PLEASE LET ME KNOW IF THERE ARE ANY QUESTIONS. Phone #: ###-#### >> Inspection requested via web by Mike TenHulzen rough-in ok cover underground from eastside of building foundation west. piping not complete on eastside at this time.
|
ELE11-01036
| Final | 12/1/2011 | 12/2/2011 | 12/2/2011 8:28:12 AM | A | PASS |
|
|
WE NEED TO BE THERE TO GET INTO THESE LOCATIONS SO IF YOU CAN CALL AND GIVE ME SOME TIME I''LL DRIVE OT MEET YOU THERE THEN WE COULD GO TO THE OTHER LOCATION TOO. Phone #: ###-#### >> Inspection requested via web by Mike TenHulzen final ok
|
ELE11-00284
| Final | 12/1/2011 | 12/2/2011 | 12/2/2011 8:11:58 AM | A | PASS |
|
|
WE NEED TO BE THERE TO LET YOU IN IF YOU CAN CALL ME AHEAD OF TIME I CAN MEET YOU THERE AND THEN WE CAN GO THE OTHER LOCATION AS WELL. I''M ABOUT 40 MINUTES FROM BOISE. Phone #: ###-#### >> Inspection requested via web by Mike TenHulzen final ok
|