FIR14-00735
| INSP-Sprinkler Rough-in | 11/24/2014 | 11/25/2014 | | A | |
|
|
RTC for Dry System, Bldg D 1st floor, please call Scott 30 minutes prior at ###-#### Phone #: ###-#### >> Inspection requested via web by Jacci Hunt
|
FIR14-00708
| INSP-Sprinkler Rough-in | 11/26/2014 | 11/26/2014 | | P | |
|
|
Matt Phone #: ###-####
|
FIR14-00531
| INSP-Conference | 11/26/2014 | 11/26/2014 | | P | |
|
|
Nate is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
|
BLD13-03405
| FIRE-Alarm Testing | 12/1/2014 | 12/2/2014 | 12/3/2014 12:00:37 PM | A | DONE |
|
|
This request is for a Courtesy Fire Alarm Inspection. Thank you. Phone #: ###-#### Inspection requested via web by Carl Benjamin
|
FIR14-00703
| INSP-Sprinkler Rough-in | 12/1/2014 | 12/2/2014 | 12/3/2014 7:11:07 AM | A | PART |
|
|
OH rough-in passed with the exception of overspaced coverage at the SW corner office. Refer to plans for dated annotation.
|
FIR14-00828
| INSP-Final Inspection | 12/1/2014 | 12/2/2014 | 12/3/2014 7:07:30 AM | A | PASS |
|
|
Fire alarm work tested satisfactory. Permit finaled.
|
BLD14-02799
| FIRE-Final Inspection | 12/2/2014 | 12/2/2014 | 12/3/2014 7:06:41 AM | P | PASS |
|
|
Fire life safety inspection passed. * Signature card not available on site at the time of inspection.
|
FIR14-00775
| INSP-Final Inspection | 12/2/2014 | 12/2/2014 | 12/3/2014 7:05:34 AM | P | PART |
|
|
Overhead fire sprinkler modifications approved for cover at the grid and sheetrock lid ceilings. Final pending ceiling tile and escutcheons.
|
BLD14-02950
| FIRE-Final Inspection | 12/2/2014 | 12/2/2014 | 12/3/2014 6:50:26 AM | P | NR |
|
|
Items needed prior to final include; suite address posted, ceiling tile throughout, missing doors installed, max. occ sign, fire extinguisher posted, project related fire sprinkler permit finaled.
|
FIR14-00718
| INSP-Alarm Testing | 12/1/2014 | 12/2/2014 | 12/2/2014 11:40:55 AM | A | PART |
|
|
Functional testing and inspection of the new fire alarm system completed. Items needed prior to final include as-built drawings reflecting field modifications to show four added strobes, deleted kitchen hood monitor, revised cd settings at the multi-purpose rooms and west corridor, riser points added for dry system pressure switches. Need to add notification at the kitchen area restroom. Post signage at the door to the FACP room.
|
FIR14-00612
| INSP-Final Inspection | 12/1/2014 | 12/2/2014 | 12/2/2014 11:33:46 AM | A | PASS |
|
|
Fire sprinkler permit work passed final walkthrough and inspection. Forward flow, trip testing and sprinkler monitoring completed. Permit finaled.
|