Inspections for the day of: Tuesday, December 2, 2014.
Number of inspections: 11
Percentage of inspections complete: 73 %
Percentage of inspections not complete: 27 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR14-00735 INSP-Sprinkler Rough-in11/24/201411/25/2014 A 
RTC for Dry System, Bldg D 1st floor, please call Scott 30 minutes prior at ###-#### Phone #: ###-#### >> Inspection requested via web by Jacci Hunt
FIR14-00708 INSP-Sprinkler Rough-in11/26/201411/26/2014 P 
Matt Phone #: ###-####
FIR14-00531 INSP-Conference11/26/201411/26/2014 P 
Nate is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
BLD13-03405 FIRE-Alarm Testing12/1/201412/2/201412/3/2014 12:00:37 PMADONE
This request is for a Courtesy Fire Alarm Inspection. Thank you. Phone #: ###-#### Inspection requested via web by Carl Benjamin
FIR14-00703 INSP-Sprinkler Rough-in12/1/201412/2/201412/3/2014 7:11:07 AMAPART
OH rough-in passed with the exception of overspaced coverage at the SW corner office. Refer to plans for dated annotation.
FIR14-00828 INSP-Final Inspection12/1/201412/2/201412/3/2014 7:07:30 AMAPASS
Fire alarm work tested satisfactory. Permit finaled.
BLD14-02799 FIRE-Final Inspection12/2/201412/2/201412/3/2014 7:06:41 AMPPASS
Fire life safety inspection passed. * Signature card not available on site at the time of inspection.
FIR14-00775 INSP-Final Inspection12/2/201412/2/201412/3/2014 7:05:34 AMPPART
Overhead fire sprinkler modifications approved for cover at the grid and sheetrock lid ceilings. Final pending ceiling tile and escutcheons.
BLD14-02950 FIRE-Final Inspection12/2/201412/2/201412/3/2014 6:50:26 AMPNR
Items needed prior to final include; suite address posted, ceiling tile throughout, missing doors installed, max. occ sign, fire extinguisher posted, project related fire sprinkler permit finaled.
FIR14-00718 INSP-Alarm Testing12/1/201412/2/201412/2/2014 11:40:55 AMAPART
Functional testing and inspection of the new fire alarm system completed. Items needed prior to final include as-built drawings reflecting field modifications to show four added strobes, deleted kitchen hood monitor, revised cd settings at the multi-purpose rooms and west corridor, riser points added for dry system pressure switches. Need to add notification at the kitchen area restroom. Post signage at the door to the FACP room.
FIR14-00612 INSP-Final Inspection12/1/201412/2/201412/2/2014 11:33:46 AMAPASS
Fire sprinkler permit work passed final walkthrough and inspection. Forward flow, trip testing and sprinkler monitoring completed. Permit finaled.