ESC14-00418
| General Inspection | 12/2/2014 | 12/2/2014 | 12/2/2014 4:59:05 PM | | PASS |
|
|
|
ESC14-00250
| Site Final | 12/2/2014 | 12/2/2014 | 12/2/2014 4:58:03 PM | P | CANC |
|
|
data entry error
|
ESC13-00707
| General Inspection | 12/2/2014 | 12/2/2014 | 12/2/2014 4:56:13 PM | | PART |
|
|
No major issues but two corrections:
1. Repair maintain sections of silt fence 2. Sweep sidewalks and street after mud is removed.
|
ESC13-00520
| General Inspection | 12/2/2014 | 12/2/2014 | 12/2/2014 4:34:29 PM | | PART |
|
|
No further construction activity, home is occupied; permit open for hillside stabilzation/vegetation requirement.
The drainage channel is directing too much water to one section of hillside causing significant rill erosion that could worsen with time and more runoff. Loose sediment is currently being trapped by the silt fence installed and the vegetative buffer that was preserved at bottom of Barrow sub.
Correction: - grade out rills, fix/re-route drainage channel - do maintenance on several sections of silt fence.
T
|
ESC14-00423
| General Inspection | 12/2/2014 | 12/2/2014 | 12/2/2014 3:54:36 PM | | PASS |
|
|
|
ESC13-01208
| Aging Inspection | 12/2/2014 | 12/2/2014 | 12/2/2014 2:21:34 PM | | PASS |
|
|
WIP. Frame is up, working on interior and need to install siding. No ESC violations.
|
ESC13-00655
| General Inspection | 12/2/2014 | 12/2/2014 | 12/2/2014 1:41:34 PM | P | PASS |
|
|
BMPs installed at Aberdeen including silt fence perimeters and DI bags; no trackout extending beyond site limits, though some minor trackout within the parking lot due to the wet weather and mud. Contractors parking on hard surfaces. No specific corrections at this time, just advised RP to continue housekeeping and trackout control as conditions improve.
|
ESC14-00838
| DOC - Permit Finaled | 12/2/2014 | 12/2/2014 | 12/2/2014 1:21:47 PM | P | PASS |
|
|
Carport complete and area stabilized. ESC conditions satisfied.
|
ESC14-00474
| DOC - Permit Finaled | 12/2/2014 | 12/2/2014 | 12/2/2014 1:13:39 PM | P | PASS |
|
|
Carport for 6772 W. Irving in Aberdeen is complete and in use. No outstanding ESC corrections or issues. Permit finaled.
|
ESC14-00473
| DOC - Permit Finaled | 12/2/2014 | 12/2/2014 | 12/2/2014 1:11:24 PM | P | PASS |
|
|
Aberdeen Square 4-plex unit construction complete and surrounding area stabilized. BLD finaled. Ongoing project in Aberdeen covered by seperate ESC permits.
|
ESC13-01178
| Aging Inspection | 12/2/2014 | 12/2/2014 | 12/2/2014 12:13:31 PM | | PASS |
|
|
Project still in progress on the interior. Parking lot was dirty from the trench work but has since been cleaned. No ESC corrections required.
|
ESC13-00982
| Aging Inspection | 12/2/2014 | 12/2/2014 | 12/2/2014 11:43:26 AM | | PASS |
|
|
WIP. Honeycomb Street and Tahoe Homes projects are currently in compliance. BMPs installed on drop inlets, lined concrete washout, and trash and materials contained.
|
ESC14-00144
| Random Inspection | 12/2/2014 | 12/2/2014 | 12/2/2014 11:22:43 AM | A | PASS |
|
|
East Valley sub drainage design and sediment control BMPs were effective in preventing sediment runoff from open areas and SFH sites during the last 2 two days of precipitation.
DIs have coir mat protection. Some minor trackout on roads, but contractors are staying off dirt and parking on street. Lined concrete washout in good condition. No discharges or other ESC issues observed at time of inspection. Still working on the sewer lift station on the south west corner.
|
ESC14-01057
| Site Preparation | 12/1/2014 | 12/2/2014 | 12/2/2014 11:16:00 AM | A | PASS |
|
|
Phone #: ###-#### >> Inspection requested via web by Braxton Hansen
Permit posted, lot ready for work and was pre-graded during sub development. RH#5 sites are in good condition. Approved to start.
|
ESC14-00333
| General Inspection | 12/2/2014 | 12/2/2014 | 12/2/2014 10:40:40 AM | | PASS |
|
|
Ranch Market has interior work and landscaping remaining. Pavement, curbing, stormwater system, and fuel tanks are all installed. No trackout or sediment runoff from site. Approved.
|
ESC13-01279
| General Inspection | 12/2/2014 | 12/2/2014 | 12/2/2014 10:30:42 AM | | PASS |
|
|
Lucky Harris 13 streets, curbs and sidewalks have been installed. Stockpile and disturbed earth at south end of site has sediment perimeter BMPs installed. The new drop inlets within the subdivision have filter bag protection.
Some survey and electrical utility crews on site, but no major activity. No corrections at this time, site looks good considering the recent precipitation. Approved.
|
ESC14-00212
| General Inspection | 12/2/2014 | 12/2/2014 | 12/2/2014 10:08:17 AM | A | PASS |
|
|
Lusk Place site is continuing to dewater in preparation for install underground culvert and manholes. Water is being discharged into the existing fabric lined pit, filters through a turbidity barrier, some wattles, and a series of settling pools created by straw bales. Water at discharge point is visibly clear and to dissipate flow at discharge pool a straw bale guides the water down and is not churning up sediment as it was last week.
Turbidity monitoring is ongoing. I requested that McAlvain provide pump rates/volume of discharge, scheduled duration, and verification of approval from DD3.
No corrections at this time.
|
ESC14-00017
| Aging Inspection | 12/2/2014 | 12/2/2014 | 12/2/2014 9:27:30 AM | | PASS |
|
|
|
ESC13-01159
| General Inspection | 12/2/2014 | 12/2/2014 | 12/2/2014 9:03:43 AM | | PASS |
|
|
No ESC issues or activity at time of inspection. Subdivsion development is mostly complete and appears to be on winter shutdown. No individual homes yet.
|
ESC14-00128
| Aging Inspection | 12/2/2014 | 12/2/2014 | 12/2/2014 8:46:25 AM | | PASS |
|
|
No new activity related to Prestige Homes' SFHs on Gatewood, which are now complete. Lot is also used by the neighborhood association landscaping crew for stockpiling. Since home construction is complete and lot is being used by the neighborhood, ESC permit is finaled.
|
ESC14-00128
| DOC - Permit Finaled | 12/2/2014 | 12/2/2014 | 12/2/2014 8:44:01 AM | P | PASS |
|
|
|