Inspections for the day of: Wednesday, December 2, 2015.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC15-00893 Conference12/1/201512/2/201512/4/2015 11:50:23 AMPPEND
Roadway this afternoon. Ramp was completely frozen earlier in week and could not be moved.

Some turbid runoff in gutter. DI has filter bag and discharges to sand window installed as part project SW infrastructure. No connection to MS4-river.

Will check monday for conditions, too wet to sweep currently.
ESC13-01159 General Inspection12/2/201512/2/201512/3/2015 11:05:50 AM FAIL
Corrections:

-Need to shovel off trackout from site on Hiawatha and Rushmores as well as Sumpter.
- Scheduled street sweeper will get the gutters.
- Need to install new concrete washout for future round of homes to started soon.
- Check all DI bags.

Verbal CN to CBH RP.
ESC15-00654 Aging Inspection12/2/201512/2/201512/3/2015 10:24:43 AM PASS
Home complete and occupied. No corrections for this site, but overall corrections issued to Hayden Homes under Aralar Park permit ESC14-00432
ESC15-00430 General Inspection12/2/201512/2/201512/3/2015 7:49:38 AM CANC
ESC15-00426 General Inspection12/2/201512/2/201512/2/2015 4:33:40 PM PASS
Approved. See ESC15-00504 for Bach Homes main Kensington permit.
ESC15-00822 General Inspection12/2/201512/2/201512/2/2015 4:20:27 PMPPART
DIs installed. No active discharges, no muddy trackout.

Verbal correction to RP Bob to have street sweeper on Pasadena now that trenching and landscaping are complete. Significant amount of loose dirt in roadway and gutter.

ESC15-00267 Site Final12/2/201512/2/201512/2/2015 3:54:53 PMPPEND
Verbal request to RP Gary:
-remove yellow ESC signs
- sweep up loose dirt and debris in the west gutter
-remove DI bag on inlet at south side of block

No violations at site, just need the above corrections to meet site final conditions. Note that all other ESC permits for Hope Ridge are closed except this one.
ESC14-00892 DOC - Permit Finaled12/2/201512/2/201512/2/2015 3:45:31 PMPPASS
ESC14-00982 Tracking Control11/30/201512/2/201512/2/2015 3:36:25 PMACANC
rescheduled for 12/3..
ESC15-00228 Aging Inspection12/2/201512/2/201512/2/2015 11:02:41 AM PASS
WIP on pool. SFH construction and front yard stabilization are complete. No trackout or discharges from site.
ESC15-00465 General Inspection12/2/201512/2/201512/2/2015 10:39:43 AM PASS
Harris Ranch Smart Start School is complete. Permanent stormwater infrastructure and landscaping is installed. No remaining BMPs. Adjacent staging lot for Terraces covered under main permit.

No loose sediment or building materials on site. Permit conditions satisfied.
ESC15-00465 DOC - Permit Finaled12/2/201512/2/201512/2/2015 10:38:07 AMPPASS
ESC13-01279 General Inspection12/2/201512/2/201512/2/2015 10:34:21 AM PASS
WIP of SFH townhomes in Harris Crossing. All DIs have inlet protection, silt fence containing sediment from active projects on east side of Caddis is effective. Some trackout through subdivision will be addressed with the regular scheduled sweeping. No trackout off site, no wind blown trash issues. Designated lined concrete washout installed.

No corrections at this time. Will suggest installation of a wattle on the west boundary of the central open area. Ground has not been tacified but has some vegetation.
ESC14-00886 Site Preparation12/1/201512/2/201512/2/2015 10:19:54 AMAPASS
Rob Phone #: ###-####

ESC permit sign posted inside gate. Existing rock entrance installed from previous gradiing/landscaping work in 2013-14. Bottom of site has vegetated berm. Silt fence installed on other side is not trenched in and is intended to be a wind barrier and trash capture. GC-RP will install J hook wattle to left of entrance.

Approved for construction. Informed Rob about new Boise City Green Ordinance for future projects.
ESC15-00006 General Inspection12/2/201512/2/201512/2/2015 8:55:56 AM PASS
ESC15-00484 General Inspection12/2/201512/2/201512/2/2015 8:54:39 AMPPASS
ESC15-01001 General Inspection12/2/201512/2/201512/2/2015 8:32:17 AMAPASS
Parking lot addition near completion. Access drive back to parking lot has been swept to reduce amount of loose sediment on pavement. Stormwater retained on site, onsite DI has protection. No trackout. No activity currently, appears some landscaping and lighting needs to be installed.