Inspections for the day of: Friday, December 2, 2016.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR14-00205 INSP-Conference12/2/201612/2/201612/6/2016 12:26:44 PMADONE
See the fire division manager entry under the building permit
BLD13-02973 FIRE-Conference12/2/201612/2/201612/5/2016 10:36:06 AMADONE
See Jim Sly's entry from speaking to the church staff
FIR14-00701 INSP-Conference12/2/201612/2/201612/2/2016 2:16:56 PMADONE
I contacted John via email and he is going to follow up with the church and get back to me.
BLD16-04262 FIRE-Final Inspection12/1/201612/2/201612/2/2016 2:15:51 PMPFAIL
See the city approved plans for corrections that include repairing the exit signs, providing annual inspection for the fire extinguishers, fire sprinkler system, fire alarm system and the hood suppression systems. Also mount the occupant load sign
FIR16-00364 INSP-Final Inspection12/2/201612/2/201612/2/2016 2:14:35 PMPFAIL
Todays inspection was to verify that the as-builts match the installation. They don't. They will need to be re-submitted.
FIR16-00626 INSP-Final Inspection12/2/201612/2/201612/2/2016 2:00:14 PMPPASS
Pemit finaled
BLD16-03673 FIRE-Final Inspection12/1/201612/2/201612/2/2016 8:39:25 AMAPASS
Life safety passed. I spoke to Javier in pland review about the storage area above the restroom. He stated that since this permit is for a vanilla finish we would address the storage area when an occupancy permit is pulled for this tenant space.